BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Salt Lake City, Utah. Completed plans call for the renovation of a medical facility.

STATEMENT OF WORK CONSTRUCTION SERVICES Project Title: Emergency Booster Pumps Upgrade Project, Bldg. 43 Date: 19 APRIL 2023 Location: Bldg. 43, Salt Lake City, UT, George E. Wahlen, Depart. of Veteran Affairs Medical Center I. SCOPE OF WORK: Furnish all necessary services, equipment, labor, materials, supervision, and tools to perform construction services for the Project, entitled Bldg. 43 Emergency Booster Pumps Upgrade, located at 500 Foothill Drive, Salt Lake City, UT 84148 on the George E. Wahlen Department of Veterans Affairs Medical Center campus. The project is located within Building 43 (Underground Concrete Vault). The existing booster pump vault houses drinking and fire water pipe, y-strainers, motors, pumps, valves, gauges, electrical panel, and variable frequency drive (VFD) for the main potable water. There are three horizontal pumps (40 HP, 1,000 GPM each) that are in parallel, along with VFD s. The pumps are needed to increase the flow and pressure to the VA Campus, especially, the higher elevation rooms. The incoming city pressure fluctuates, however, averages 65-psi into the pump room via a 12-inch diameter carbon steel pipe. The pipe then splits into three parallel 6-inch pipes. Then the water discharges post pump(s) into a 12-inch diameter carbon steel pipe with a 30-psi increase in pressure to roughly 95-psi. The pumps should have the ability to work alone, or in tandem to meet the required fire and domestic water demands of the hospital/campus. The pumps should maintain the required output pressure, however, increase the output flowrate at any given time as needed. The existing butterfly valves are failing. Only one motor/pump is currently operational. Two VFD s are newer and working, however, the other VFD has failed. The motor/pumps are labeled Booster Pump (BP-1), BP-2, and BP-3. BP-1 is the pump lowest to the ground, BP-2 is the middle pump, and BP-3 is the upper pump. The motor/pumps report to Bldg. 7 Johnson Controls Metasys system. See drawings for this project for additional detail. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions in relation to this solicitation must be submitted in writing via e-mail to jason.rankin@va.gov and received no later than 06-12-2023 at 10AM MDT.

Post-Bid

Medical

$500,000.00

Public - Federal

Renovation

8

11

4

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
31
Bidding Soon
552
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

July 20, 2023

img_map_placeholder

500 Foothill Dr, Salt Lake City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.