BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2023 at 8:00 PM

Updated January 29, 2024

Site work, paving and new construction of a mixed-use development in Port Townsend, Washington. Completed plans call for the construction of a multi-residential development; for site work for a multi-residential development; and for paving for a multi-residential development.

Caswell-Brown Village Phase 3 is an 11,000 square foot single story homeless shelter and permanent supportive housing center. The site is already graded, however, sitework will include paving for parking, stormwater retention swales, and septic installation. Construction will be site built and wood framing with slab on grade foundations and footings. A draft floorplan and site plan are attached.

Post-Bid

Multi-Residential

$3,600,000.00

Public - County

New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
334
Active Projects
175
Bidding Soon
2,086
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2023

August 9, 2023

Project location map

142 Mill Rd, Port Townsend, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.