Published June 7, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Plattsburgh, New York. Completed plans call for the renovation of a water tank for rehabilitation.

The scope of the Power System Analysis shall include all new distribution equipment supplied under this Contract at the Well Field Site Only. Intent is to provide a complete power system study for the Well Field Site. The Power System Analysis shall be performed to account for all normal and emergency sources of power. 1. Note, power system study at the Water Filtration Plant is to be completed as part of a future project and is not included/required as part of this specification. 2. Note, the scope of this study is to also include any control panels which are supplied as part of the project and shown on the electrical drawings. Contractor to coordinate with manufacturer/supplier to obtain necessary information to complete study. 3. Provide NFPA 70E compliant Arc Flash training. D. REFERENCES: The publications listed below and their latest revisions form a part of this Specification. Adhear to applicable sections of the following publications: 1. American National Standards Institute (ANSI) Publications. 2. Institute of Electrical and Electronics Engineers (IEEE) Publications. 3. National Fire Protection Association (NFPA) Publications: 4. National Electric Code (NEC) 5. OSHA

Post-Bid

Water / Sewer

$400,000.00

Public - City

Renovation

51

22

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Controllers, Enclosed Controllers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Transfer Switches, Automatic Transfer Switches, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Roadway Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Landscape Grading, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Pressure Piping Tied Joint Restraint System, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Pipe Culverts, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
148
Bidding Soon
1,999
All Active Projects
917
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

July 6, 2023

img_map_placeholder

Multiple Locations, Plattsburgh, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Drinking Water System Improvements-Phase 1 Well PW-1 project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.