BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Whittier, California. Completed plans call for the renovation of a wastewater treatment plant.

The purpose of this Request for Proposals (RFP) is to solicit proposals from qualified trucking companies (Proposer) to transport brine generated from the Advanced Water Treatment Facility (AWTF) at the Districts' Valencia Water Reclamation Plant (VAWRP) in Valencia, California to the Districts' Joint Water Pollution Control Plant (JWPCP) in Carson, California. The VAWRP Pre-Proposal Jobsite Walk-Through: May 16, 2023 at 10:00 am The JWPCP Pre-Proposal Jobsite Walk-Through: May 17, 2023 at 10:00 am QUESTCDN No. 8510756 The scope of work will be performed by the Contractor for three (3) years beginning on the effective date of the Agreement and will include all labor, parts, tools, materials, and equipment needed to efficiently and continuously transport brine from VAWRP in Valencia, CA to JWPCP in Carson, CA. The Districts brine will be maintained at a pH between 6.0 and 12.4 and will not be considered as hazardous or toxic. Any brine with pH of 12.5 will be considered a hazardous waste and will not be accepted at the liquid waste discharge station. Crystallization and/or precipitation may occur when brine pH is below 5.6. The Appendix A provides information regarding a typical brine waste composition. The anticipated volume of brine to be delivered to JWPCP would range between 14,000 to 52,000 gallons per day (1,872 to 6,952 cubic feet per day). Actual haul volumes will be as scheduled by the Districts. LAST DAY FOR QUESTIONS: Wednesday, May 24, 2023 by 3:00 pm All bids rejected

Post-Bid

Water / Sewer

$2,800,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
106
Bidding Soon
2,268
All Active Projects
1,014
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2023

September 28, 2023

img_map_placeholder

Multiple Locations, Whittier, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.