BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2024 at 8:00 PM

Updated April 4, 2024

Renovation of a clubhouse / community center in Fond du Lac, Wisconsin. Completed plans call for the renovation of a clubhouse / community center.

Each proposal shall be accompanied by a certified check, or bank draft, payable to the City of Fond du Lac, or satisfactory bid bond, in the amount of 5% of the gross bid as a guarantee that if the bid is accepted as the successful bid, such successful bidder will execute and file the proposed contract and performance bond within ten (10) days after notice of award of contract A 100% performance bond will be required. The form is included with this packet for your reference. Inquiries regarding this Request for Proposals will be accepted via E-mail only, addressed to Cameron Fails, at cfails@fdl.wi.gov. Unauthorized contact regarding the RFP with other City of Fond du Lac employees may result in disqualification. All inquiries must be received no later than 12:00 P.M. CST, Friday, March 15th, 2024. Not to affect Senior Center operations. Staging material to be approved by Senior Center project manager - Dyann Benson. Jobsite to be cleaned daily, ensuring no nails, etc. left on the ground. Asphalt Shingles o Approximate 12,750 square feet o Complete tear off, including all underlayment and flashings (step, gutter apron, and edging material) o All counter flashings to be removed and replaced and to be sealed properly against the building color to match what is existing. o Ice and water shield up 6'0" from edges, and installed wherever step flashing is used, and in all valleys. o Standard underlayment to be installed. o 50 Year architectural shingle with stain guard. Color TBD by owner o All prefinished metal flashings to be white in color o All ridges to have ridge vents installed, cut out per manufacturer specs o Roof classification minimum type B o Install plumbing stack vent shields as needed to be color matched o Remove and discard existing heat tape on South East roofline

Post-Bid

Clubhouse / Community Centers

$300,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
84
Bidding Soon
1,256
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

April 22, 2024

Project location map

151 E 1st St, Fond du Lac, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.