Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 3, 2024 at 8:00 PM
Updated April 4, 2024
Renovation of a clubhouse / community center in Fond du Lac, Wisconsin. Completed plans call for the renovation of a clubhouse / community center.
Each proposal shall be accompanied by a certified check, or bank draft, payable to the City of Fond du Lac, or satisfactory bid bond, in the amount of 5% of the gross bid as a guarantee that if the bid is accepted as the successful bid, such successful bidder will execute and file the proposed contract and performance bond within ten (10) days after notice of award of contract A 100% performance bond will be required. The form is included with this packet for your reference. Inquiries regarding this Request for Proposals will be accepted via E-mail only, addressed to Cameron Fails, at cfails@fdl.wi.gov. Unauthorized contact regarding the RFP with other City of Fond du Lac employees may result in disqualification. All inquiries must be received no later than 12:00 P.M. CST, Friday, March 15th, 2024. Not to affect Senior Center operations. Staging material to be approved by Senior Center project manager - Dyann Benson. Jobsite to be cleaned daily, ensuring no nails, etc. left on the ground. Asphalt Shingles o Approximate 12,750 square feet o Complete tear off, including all underlayment and flashings (step, gutter apron, and edging material) o All counter flashings to be removed and replaced and to be sealed properly against the building color to match what is existing. o Ice and water shield up 6'0" from edges, and installed wherever step flashing is used, and in all valleys. o Standard underlayment to be installed. o 50 Year architectural shingle with stain guard. Color TBD by owner o All prefinished metal flashings to be white in color o All ridges to have ridge vents installed, cut out per manufacturer specs o Roof classification minimum type B o Install plumbing stack vent shields as needed to be color matched o Remove and discard existing heat tape on South East roofline
Post-Bid
Clubhouse / Community Centers
$300,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2024
April 22, 2024
151 E 1st St, Fond du Lac, WI
Related To This Project
Fond du Lac, WI
Bid Date: Jun 07 2023
Fond du Lac, WI
Bid Date: Jun 20 2023
Fond du Lac, WI
Bid Date: Jun 08 2023
Fond du Lac, WI
Bid Date: Jun 12 2023
Fond du Lac, WI
Bid Date: Jun 12 2023
Fond du Lac, WI
Bid Date: Jun 30 2023
Fond du Lac, WI
Bid Date: Jul 20 2023
Fond du Lac, WI
Bid Date: Jul 05 2023
Fond du Lac, WI
Bid Date: Jun 07 2023
Fond du Lac, WI
Bid Date: May 17 2023
Fond du Lac, WI
Bid Date: May 11 2023
Fond du Lac, WI
Bid Date: May 09 2023
Fond du Lac, WI
Bid Date: Apr 25 2023
Fond du Lac, WI
Bid Date: Apr 20 2023
Fond du Lac, WI
Bid Date: Apr 27 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
