Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a military facility in Kings Bay Base, Georgia. Completed plans call for the renovation of a military facility.
This acquisition will result in the award of a Firm-Fixed-Price (FFP) Task Order (TO) for Building 6003 Roof Replacement, Naval Submarine Base, Kings Bay, GA The purpose of this project is to remove existing low-slope membrane roof systems in their entirety down to roof deck and install complete, new, insulated watertight modified bitumen roof system. Building 6003 is a steel framed secured warehousing and admin facility. Main roof area is approximately 200 x 500 and approximately 40 above grade. Lower level roof area at NW end of facility is approximately 20 x 70, approximately 20 above grade. Existing membrane roof system is sprayed polyurethane foam applied over EPDM roof membrane, rigid board roof insulation, and metal deck. Work area includes upper main roof, lower roof on NW (north) end of building, and all canopy roofs on NE (east) side of building. Metal canopy roofs are not in contract. Slope in existing roof framing structure must be supplemented with tapered insulation to develop not less than 1/4-inch per foot finished drainage slope and to direct runoff to drainage inlets. Remove all existing rooftop smoke hatches and existing abandoned curbs. Infill deck opening with new metal roof deck. Install all support framing required. Design and construct structural modifications to transfer roof diaphragm shear forces to the interior concrete shear walls between open webbed steel joist seats in area identified. Analyze roof diaphragm, diaphragm connections to roof framing members and diaphragm-to-wall connections in accordance with UFC 3-301-01. Perform structural modifications as necessary to resist design wind loads. Provide new lightning protection system. The potential site visit attendees are required to submit the SECNAV 5512 (Attachment 6) for each individual planning to attend the site visit. Submit the form to the following email addresses NOT LATER THAN FRIDAY, APRIL 21, 2023, by 12:00 PM ET: All inquiries concerning the technical aspects of the attached specifications must be submitted and received by the Contracting Office no later than 5:00 PM ET on Wednesday, May 31, 2023, in order to permit adequate time for the government to reply to the inquiry N69450-22-D-0018 / 0019 / 0020 / 0021 / 0022 Design and construction for roof system removal and replacement, removal of smoke hatches and roof deck infill, removal and installation of lightning protection system and certification. All work must meet requirements of the RFP. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to August 2023. Construction is expected to take 240 calendar days. The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.
Post-Bid
Military
$5,000,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2023
August 8, 2023
To Be Determined, Kings Bay Base, GA
Related To This Project
Kings Bay Base, GA
Bid Date: Aug 12 2022
Kings Bay Base, GA
Bid Date: May 24 2023
Kings Bay Base, GA
Bid Date: May 17 2023
Kings Bay Base, GA
Bid Date: Jul 20 2022
Savannah, GA
Bid Date: May 26 2023
Grovetown, GA
Bid Date: Jun 01 2023
Hephzibah, GA
Bid Date: May 16 2023
Statesboro, GA
Bid Date: May 22 2023
Atlanta, GA
Bid Date: Jun 06 2023
Atlanta, GA
Bid Date: May 17 2023
Calhoun, GA
Bid Date: May 19 2023
Hartwell, GA
Bid Date: Dec 15 2020
Griffin, GA
Bid Date: Dec 15 2020
Savannah, GA
Bid Date: Jan 12 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.