BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Birmingham, Alabama. Completed plans call for site work for a water / sewer project.

Construction of Lake Purdy Dam Stability Improvements Project includes but not limited to the following scope of work: 1. Roadway Construction a. Site work, grading and widening of the roadway. b. Construction and installation of roadway erosion and sedimentation control. c. Installation of chert which includes transportation and excavation of chert from a borrow area and placing, grading, and compacting on the roadbed. d. Installation of a dense grade stone pavement on the entrance road of all graded or new roadbed where chert or other pavement is not applied. e. Installation of storm pipes along the roadway. f. Maintenance of roadway throughout the duration of the project. 2. Dam Rehabilitation a. Demolition and disposal of all materials of the existing pole barn in the laydown area. b. Clearing, grubbing, and grading. c. Providing and maintaining erosion and sediment control measures, and obtaining stormwater NPDES Permit. d. Construction of a sedimentation pond and outfall structure. e. Extending and encasing the existing low-level outlet pipes. f. Providing reinforced concrete for pipe encasement, stilling basin, training walls, retaining walls, spillway control section, and raising the dam crest. g. Providing roller compacted concrete (RCC) buttressing of the dam. h. Installing cast-in-place concrete step-facing system. i. Installation of earthfill berms for support of non-overflow sections of the dam and temporary levels to serve as grouting platforms. j. Performing comprehensive foundation grouting through and underneath the dam. k. Passive dowels into rock, masonry, and concrete to secure proposed work to foundation and/or existing dam. l. Conducting CCTV and geo-location of lower inlet pipe at valve house. m. Repair and sealing of interior walls of valve house. n. Replacement of valves in valve house and replacement of roof in valve house. o. Installing filter drains within the earthfill abutments. p. Constructing earthfill abutments. q. Miscellaneous site improvements and site piping as required. r. Other miscellaneous associated items as necessary to complete the work. Each bid shall be accompanied by a cashier’s check, drawn on an Alabama Bank, or bid Bond in the amount of five percent (5%) of the bid not to exceed $50,000.00 in the form and subject to conditions provided for in the Specifications. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in an amount equal to 100 percent of the Contract Award. The purpose of the pre-bid conference is to raise questions pertaining to the Bidding and Contract documents and for the OWNER or its representatives to clarify any points. All Contractors shall complete and submit HUB Bid Solicitation Notice (HUB Form 3) no later than seven (7) days after the scheduled date of the pre-bid conference. This form may be submitted in person at the pre-bid conference. Bids will NOT BE ACCEPTED from any Prospective Bidder who does not attend the mandatory Pre-Bid Conference. It is the intent of the BWWB to foster competition among contractors, suppliers and vendors that will result in better quality and more economical services for the BWWB. Under this program, the BWWB has established a goal of 30% participation of HUB firms for services required for BWWB construction projects. The BWWB’s stated goal will not be the determining factor in construction contract awards; rather bidders must demonstrate compliance with the Good Faith Efforts, more particularly outlined in the HUB Program, toward meeting said goal. The OWNER reserves the right to reject any and all proposals, the right to waive irregularities or to accept any proposal deemed to be in the best interest of the OWNER.

Post-Bid

Water / Sewer

$100,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
33
Bidding Soon
516
All Active Projects
224
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

img_map_placeholder

To Be Determined, Birmingham, AL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.