BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Brattleboro, Vermont. Completed plans call for site work for a water / sewer project.

**As of June 05, 2023, this project has not yet been awarded. The Project is expected to be awarded on June 7, 2023.** Town of brattleboro, vermont whetstone brook floodplain restoration at 250 birge street fema project 4330-9r seeking bid proposals from qualified contractors to perform all aspects of creation of 7 acres of floodplain restoration at 250 birge street. The Town of Brattleboro is requesting bid proposals from qualified Contractors to perform all aspects of creation of 7 acres of floodplain restoration at 250 Birge Street in Brattleboro, Vermont. Work tasks will generally involve installation of construction signs; installation and maintenance of erosion and sediment controls; establishment of construction site access; staking out of project features; clearing the site of select vegetation; improvement and protection of a water line; improvement and protection of a sewer line; excavation and haul of gravel fill; partial berm removal; riprap removal; site grading; building of park amenities; wetland restoration; landscaping with native species; and site restoration. Work includes excavation of an estimated 49,300 cubic yards (in place) of gravel fill. (Over)Excavated clean gravel from soil management area A (41,100 cubic yards) will become the property of the Contractor and shall be hauled to a legal site that must be approved by the Project Engineer. Two potential sediment disposal sites have previously been identified, and information is listed below so bidders may contact the owners. Excavated PAH impacted soils from soil management area B (8,200 cubic yards) will be placed in soil management area A on site. Email to bbannon@brattleboro.org All questions must be submitted in written form by Email to rschiff@slrconsulting.com not later than Thursday May 18 by 5:00 pm in order to be considered

Award

Water / Sewer

$1,365,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
111
Bidding Soon
1,950
All Active Projects
863
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2023

June 26, 2023

img_map_placeholder

250 Birge St, Brattleboro, VT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.