Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Olive Branch, Illinois. Contact the soliciting agency for additional information.
This project may contain Federal Funds. This project requires 12% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 1, 2023, at 10:00 AM at the Region Five/District Nine Office in Carbondale. Phase I engineering services are required for all work associated with the preparation of preliminary engineering and environmental studies for the End-of-Life Plan for the US 60/62 bridge (S.N. 002-0005) and its removal over the Mississippi River between Alexander County, Il and Mississippi County, MO, the structure length is approximately 1.05 miles. Phase I engineering services are required to prepare a Combined Design Report and Environmental Assessment (EA) for the US 60/62 Bridge End-of-Life Plan and bridge removal. We desire to develop a plan to determine what steps would be required to permanently close the bridge as well as what additional work and funds would be required to keep it in operation in the interim period. Phase I work is anticipated to include but not be limited to data collection as well as analysis including: Bridge Condition Report; environmental survey request; combined design report; Environmental Assessment; Section 4(f) documentation; NEPA report; section 106 process; public involvement; Environmental Justice public involvement, quarterly stakeholder meetings; public hearings in both Illinois and Missouri; documentation and analysis of environmental surveys; detour route traffic modeling, analysis and signing; estimated future maintenance costs, structure deterioration rates and repair costs, agreements and permits, and all other work necessary to document Phase I studies based on current information. The Consultant selected for this project will also be required to provide a detailed specification on the suggested sequencing of the closure, bridge removal requirements, bridge removal process and the most efficient way to package the construction. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Location Design Studies (Reconstruction/Major Rehabilitation) Structures (Major River Bridges) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 43 - RFQ - Us 60/62 Over the Mississippi River Near Cairo, Phase I Project, Alexander County, Region Five/district Nine.
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2023
US 60/62, Olive Branch, IL
Related To This Project
Olive Branch, IL
Bid Date: Aug 04 2023
Olive Branch, IL
Bid Date: Jun 16 2023
Olive Branch, IL
Bid Date: Feb 16 2022
Olive Branch, IL
Bid Date: Feb 22 2024
Olive Branch, IL
Bid Date: Jun 14 2024
Olive Branch, IL
Bid Date: Feb 23 2023
Olive Branch, IL
Bid Date: Mar 10 2023
Olive Branch, IL
Bid Date: Feb 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.