Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Council Bluffs, Iowa. Completed plans call for paving for a road / highway; for site work for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The contractor shall furnish all bonds, proof of insurance, labor, materials, clean-up and guarantee to complete the full depth PCC patching along Circle Drive from the 4-way stop at the Student Center, to Visitor Lot 7. All material will be of professional grade and quality and will be installed according to manufacturer guidelines. Sawcut and remove approximately 21,000 sq. ft. of damaged concrete along Circle Drive as per attached map and installation of full depth PCC patching as per specifications below. Sawcut and remove approximately 975 lineal feet of damaged concrete curb and gutter along Circle Drive and installation of 2' wide typical concrete curb and gutter as per specification below. ALL FULL DEPTH PCC PATCHING SHALL BE PER SUDAS SPECIFICATION 7040, INCLUDING SUDAS FIGURES 7040.101 OR 7040.102. JOINTS SHALL BE PER SUDAS PV-101 Contractor Shall Saw Cut Existing Pavement Full Depth. The Pcc Patch Shall Be, at a Minimum, Existing Thickness +2". Dowels or Tie Bars Shall Be Used When Required by Sudas, Refer to Pv-101 for Sizing. All Dowels or Tie Bars Shall Be Epoxy Coated. All Pcc Pavement Mix Shall Be Idot Mix C-47b or C-47b-wr. A Liquid Curing Compound Shall Be Sprayed to a Continuous, Uniform Film on the Horizontal Surface and Vertical Edges Of Pavement, Curbs, and Back of Curbs Immediately After Surface Moisture Has Disappeared, but No Later Than 30 Minutes After Finishing. Concrete Shall Reach a Minimum Compressive Strength of 3,000 Psi Before Opening to Traffic. If Concrete Cylinders Are Not Obtained, a Minimum of 7 Days Shall Be Required Before Opening. A 5% bid bond is required. No bidder may withdraw their proposal within 60 days after the bid opening. A 100% Performance Bond and Payment Bond will be required. The work must be completed during normal business hours, Monday - Friday, 6:00 a.m. to 5:00 p.m. unless advance arrangements have been made with Travis Martin, Director of Facilities. The work may be started, June 5, 2023, and must be completed no later than July 31, 2023, unless an extension is agreed to by Iowa Western Community College. The Owner reserves the right to order the Contractor to remove any person from the work or property who the Owner determines to be in violation of federal, state or local laws, Owner policies or a threat to the safety of employees, other workers, visitors, or otherwise.
Award
Roads / Highways
$391,592.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 31, 2023
June 5, 2023
Circle Dr, Council Bluffs, IA
Related To This Project
Council Bluffs, IA
Bid Date: May 25 2023
Council Bluffs, IA
Bid Date: Jul 20 2023
Council Bluffs, IA
Bid Date: Jul 13 2023
Council Bluffs, IA
Bid Date: Jun 29 2023
Council Bluffs, IA
Bid Date: Jun 27 2023
Council Bluffs, IA
Bid Date: Aug 01 2023
Council Bluffs, IA
Bid Date: Jul 14 2023
Council Bluffs, IA
Bid Date: Jul 10 2023
Council Bluffs, IA
Bid Date: May 25 2023
Council Bluffs, IA
Bid Date: Jul 31 2023
Council Bluffs, IA
Bid Date: May 23 2023
Council Bluffs, IA
Bid Date: May 01 2023
Council Bluffs, IA
Bid Date: Apr 20 2023
Council Bluffs, IA
Bid Date: Apr 21 2023
Council Bluffs, IA
Bid Date: Apr 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.