BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of a playground / park / athletic field in Columbus, Wisconsin. Completed plans call for the remodel of a playground / park / athletic field; and for the renovation of a playground / park / athletic field.

Site Directions: Columbus Fireman's Park 1049B Park Ave Columbus Wi. Project Category Code: Buildings Rehabilitation/Renovation, Buildings/Public Description: Scope of the project is interior and exterior, and includes complete gut remodel of two existing toilet rooms with buildng envelope/ insulation upgrades, replacement of the existing front entry door with new door and sidelites, new doors and windows to enclose exsting breezeways with new finishes, new baseboard trim assembly with new electrical outlets at interior of exising assembly space, refurbishment of various existing windows and interior doors, as well as various improvements to existing interior finishes. Included as alternates are provision of design and installation of a new HVAC system (existing building is currently completely unconditioned), and provision of new wood storm windows at existing windows. The existing building is on the State and National Historic Registers. Remodeling and improvements to the existing RestHaven Building, located in Columbus, Wisconsin. Scope of the project is interior and exterior, and includes complete gut remodel of two existing toilet rooms with buildng envelope/ insulation upgrades, replacement of the existing front entry door with new door and sidelites, new doors and windows to enclose exsting breezeways with new finishes, new baseboard trim assembly with new electrical outlets at interior of exising assembly space, refurbishment of various existing windows and interior doors, as well as various improvements to existing interior finishes. Included as alternates are provision of design and installation of a new HVAC system (existing building is currently completely unconditioned), and provision of new wood storm windows at existing windows. The existing building is on the State and National Historic Registers, however this is not anticipated to affect any construction means or methods. The Owner expects the project will start in a timely manner and be completed by April, 2024.

Post-Bid

Playgrounds / Parks / Athletic Fields

$400,000.00

Public - City

Remodeling, Renovation

10

17

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
60
Bidding Soon
953
All Active Projects
378
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

July 10, 2023

img_map_placeholder

1049b Park Ave, Columbus, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.