BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work and paving for a road / highway in St. Albert, Alberta. Working plans call for site work for a road / highway; and for paving for a road / highway.

The proposed Fowler Way alignment is located north of Villenueve Rd. between Range Road 260 and St. Albert Trail. It will be a major east-west arterial, approx. 3.9 km long, connecting St. Albert Trail/Hwy 2 to Ray Gibbon Drive. Current plans call for the construction of the first 400m portion of Fowler Way west of St. Albert Trail. TIMELINE: Project is in design. Construction may be planned for 2027 or 2028, pending capital funding approvals. *Total cost for the Fowler Way alignment project is estimated at $66.4 million (including engineering).

Final Planning

Roads / Highways

$7,900,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
20
Bidding Soon
561
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2028

Project location map

Multiple Locations, St. Albert, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.