Published April 2, 2024 at 8:00 PM

Updated April 3, 2024

Site work for a civil project in St. Albert, Alberta. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.

The work to be undertaken is generally described as Bridge Rehabilitation - Perron Street & St. Albert Trail Bridges in the City of St. Albert and includes, but not limited to: Perron Street Bridge Rehabilitation: Mobilization and demobilization Handrail - remove and dispose Tree removal, disposal, and stump grinding Tree relocation Slope protection, shared use path and retaining wall - remove and dispose Concrete/asphalt surface - remove and dispose NW concrete block retaining wall - remove and dispose Screw piles - supply and install Structurally supported shared use path incl. drainage system and stainless-steel dowels - supply and install Concrete slope protection - supply and install Bonded concrete overlay incl. milling - supply and install Concrete panels incl. 150mm granular base and subgrade preparation - supply and install Asphalt trail (10mm LT, PG58-28) incl. 200mm granular base and subgrade preparation - supply and install Heavy rock riprap - salvage and re-install Heavy rock riprap (Class 1) - supply and install Handrail incl. base plates - supply and install Slope regrading, topsoil, and seeding Flashing - supply and install Miscellaneous repairs incl. joint cleaning and re-grading south abutment wingwall gravel Partial depth concrete repairs Earth swale incl. erosion control blankets - supply and install Environmental access and protection measures Girder bearing reset and keeper plate installation incl. jacking plan Concrete parapet repairs Swale grate - supply and install (Deletable) Wood fence (1400mm) - supply and install (Deletable) St. Albert Trail Bridge Rehabilitation: Mobilization and demobilization Handrail - remove and dispose Concrete/asphalt surface - remove and dispose (full depth) Timber piles - remove and dispose Bonded concrete overlay incl. milling - supply and install Concrete panels incl. 150mm granular base and subgrade preparation - supply and install Asphalt trail (10mm LT, PG58-28) incl. 200mm granular base and subgrade preparation - supply and install Heavy rock riprap (Class 1) - supply and install Handrail incl. base plates - supply and install Concrete retaining walls - supply and install Slope regrading, topsoil, and seeding Flashing incl. edge trim - supply and install Miscellaneous repairs incl. joint cleaning, NE cover plate, sealing existing retaining wall joints Partial depth concrete repairs Earth swale incl. erosion control blanket - supply and install Environmental access and protection measures Swale grate - supply and install (Deletable) Documents can be obtained from https://stalbert.bidsandtenders.ca/

Award

Bridges / Tunnels

$1,316,000.00

Public - State/Provincial

Site Work

15

22

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
33
Bidding Soon
503
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

April 1, 2024

Project location map

Multiple Locations, St. Albert, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.