BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 29, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Roswell, Georgia. Completed plans call for site work for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of Roswell has the right to reject any or all bids. The City of Roswell is seeking a qualified contractor to construct a right turn lane and multi-use trail on Woodstock Rd at SR92; roadway shift along King Rd to accommodate the extension of the right turn lane to Roswell High School and a multi-use trail along King Rd. Major elements include but are not limited to stormwater treatment, grading, traffic control, construction of sidewalk, and asphalt paving.

Award

Roads / Highways

$1,205,196.00

Public - City

Paving, Site Work

74

8

15

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
2
Bidding Soon
1,173
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

July 10, 2023

Project location map

Multiple Locations, Roswell, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.