BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Del Rio, Texas. Completed plans call for site work for a water / sewer project.

The purpose of the project is to repair the eroded lagoon clay liner, replace with a geomembrane liner, and install a leak detection system in the Wastewater Lagoon 1. This project is a design-build contract. The Contractor shall be responsible for completing a 100% design. The Contractor shall also be responsible for the construction of the approved design as described herein. The 100% design shall be approved by the Government prior to the beginning of construction. The Contractor shall furnish all labor, equipment, material, transportation, administration, supervision, and all else necessary to obtain all information and engineering design data through on-site investigation, reconnaissance, and surveys, as required to complete the scope of work described within this Statement of Objectives (SOO). 1. Funds are not currently available for this solicitation. 2. See Section A - Complete blocks 14 through 20c using a typewriter or black ink. 3. Complete Section B - Supplies or Services and Prices. 4. Complete Section K - Representations, Certifications and Other Statements of Offerors and return it with an offer. 5. See clause 52.204-8 in Section K for submission of annual representations and certifications. 6. See Section L - Instructions, Conditions and Notices to Bidders for details. 7. Sections K, L, & M will be physically removed upon resultant award and incorporated into the contract by reference. 8. See clause 52.211-10 for information applicable to the blanks in Block 11. 9. Small Business Size Standard: NAICS: 237110 Dollars: $45 Million The disclosure of magnitude for this project is between $1,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor shall determine condition and integrity (including any required tests), establish design criteria, perform design, implement repairs, install systems, and perform any required performance tests in accordance with applicable state and federal regulations. 2.2. The Contractor shall furnish all labor, equipment, material, transportation, administration, supervision, and all else necessary to obtain all information and engineering design data through on-site investigation, reconnaissance, and surveys, as required to complete the scope of work described within this Statement of Objectives (SOO). RFI send befor Friday 2 June 2023 at 12:00 PM CST.

Post-Bid

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

3

5

6

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
6
Bidding Soon
74
All Active Projects
31
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 14, 2023

August 15, 2023

July 23, 2024

img_map_placeholder

To Be Determined, Del Rio, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.