BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a parking garage in Norfolk, Virginia. Completed plans call for the renovation of a parking garage.

IFB# 23-ODU-19-DAY The Scope of Work shall consist of and is generally described as parking structure repairs, as detailed by structure to include: bearing pad replacement, sealant joint replacement, expansion joint replacement and concrete repairs The following structures are impacted: 43rd and Elkhorn Avenue Garage (A) - Approximately 583 vehicles, three supported levels, pre-topped precast concrete double tees. Constant Center and 45th Street Garage (D) - Approximately 925 vehicles, four supported levels, pre-topped precast concrete double tees. 49th Street Stadium Garage (E) - Approximately 719 vehicles, five supported levels, pre-topped precast concrete double tees Anticipated construction duration based on: Award on or about June 15, 2023; with Substantial Completion on or before August 15, 2023, with Final Completion dated September 15, 2023. In order to maintain the posted Bid due date, all questions are due via email no later than Monday, May 15, 2023 @ 10:00 A.M. A Bid Bond equal to five percent (5%) of the amount of the bid is required as part of the bid submission (with the bid). Both the Standard Performance Bond and Standard Labor and Material Payment Bond in the amount of one hundred percent (100%) of the accepted bid will be required of the successful low bidder This work consists of all labor, materials, tools and equipment required for setting-up general plant, storage/staging areas and facilities required by State Laws and City Ordinances; and the general mobilization of equipment required for the completion of the work shown on the Contract Documents. The cost of this item shall include all permits and fees required to perform the project, unless otherwise noted in the Contract Documents, and all expenses for the de-mobilization to a 'broom clean or better' condition after the work has been completed. If a building permit is required, it will be the contractor's responsibility to get the necessary permit to perform the repair work, unless noted otherwise in the documents. This work shall also include the following items: Reviewing existing electrical plans, if available, and existing conditions for each phase of the work to identify the likelihood of embedded conduits/wiring in the floor slabs. All existing mechanical and electrical services shall be maintained/restored by the Contractor for all work areas. Provide effective ventilation system to safely remove all dust and hazardous fumes generated from the concrete demolition and any surface treatment applications. Protection of overhead fire protection system to be maintained in-place, if any. Protection of existing overhead mechanical and electrical systems, if any, to be maintained in-place. Removal of loose overhead concrete from the structural concrete members in areas adjoining work locations within the structure prior to the start of any demolition work. Coordinate and assist the security and property management personnel in respect to the security of spaces during the repair work. Electricity (power) and water required for the completion of the work shall be furnished by the Owner at existing fixtures or outlets. (The Owner will not provide any temporary pipes, cables, etc.). The contractor shall provide temporary lighting in the work areas, as required, during the restoration work. If the existing capacity is insufficient for the contractor's use, the contractor is responsible for supplementing existing capacity as needed.

Award

Parking Garage

$222,480.00

Public - State/Provincial

Renovation

17

16

6

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
70
Bidding Soon
1,315
All Active Projects
592
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 30, 2023

June 15, 2023

September 15, 2023

img_map_placeholder

Multiple Locations, Norfolk, VA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.