BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Wayne, Pennsylvania. Completed plans call for site work for a bridge / tunnel.

The work to be done under this Contract consists of all labor, equipment, materials, and other facilities necessary and proper to complete-in-place the Ithan Valley Bridge Culvert and Arch Rehabilitation in Radnor Township, Delaware County, PA, including but not limited to stone masonry culvert rehabilitation, grouted bag placement, concrete construction, rip-rap placement, E&S controls, roadway reconstruction, and all other associated work listed herein, and as indicated on the plans.

Bid Results

Bridges / Tunnels

$202,280.00

Public - City

Site Work

8

7

4

4

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
877
Active Projects
397
Bidding Soon
5,582
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2023

July 13, 2023

Project location map

To Be Determined, Wayne, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.