BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Wayne, Pennsylvania. Completed plans call for site work for a water / sewer project.

As of October 18, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. This project involves the ecological and stormwater restoration of an existing area that currently receives approximately 60 acres of runoff from developed areas in Radnor Township. Runoff is currently conveyed to the site via municipal storm sewers. The project includes the removal of historic fill to create a naturalized stormwater detention/slow-release system, as well as the construction of two (2) subsurface stormwater detention/slow-release systems. One system is to be located beneath an existing municipal parking lot that will be repaved in porous asphalt. The second system is to be located beneath the lawn of the existing Radnor dog park area. The project will include significant removal of non-native invasive species and restoration with native species. Clarification Deadline: 7/7/2023 4:00 PM Dial by your location o +1 305 224 1968 US o +1 309 205 3325 US o +1 312 626 6799 US (Chicago) o +1 646 931 3860 US o +1 929 205 6099 US (New York) o +1 301 715 8592 US (Washington DC) o +1 689 278 1000 US o +1 719 359 4580 US o +1 253 205 0468 US o +1 253 215 8782 US (Tacoma) o +1 346 248 7799 US (Houston) o +1 360 209 5623 US o +1 386 347 5053 US o +1 507 473 4847 US o +1 564 217 2000 US o +1 669 444 9171 US o +1 669 900 6833 US (San Jose) Meeting ID: 837 2893 4159 Passcode: 533540 Find your local number: https://us02web.zoom.us/u/kelYvqDsM6 Radnor Township reserves the right to add or delete portions of work based on budgetary constraints. The Township requires compliance with the provisions of Ordinance 2022-08, Responsible Contractor Requirements for Township Contracts. If a firm fails to provide a Contractor Responsibility Certification required by this section in any bid submission to the Township, such failure shall constitute grounds to reject such bid as non-compliant with this ordinance and shall disqualify such firm from bidding. No action of any nature shall lie against the Township because of its refusal to accept or award a bid for failing to provide information required by this section. The Notice of Intent to Award date for this project is tentatively scheduled for Thursday, July 20, 2023 and the award date for this project is tentatively scheduled for Monday, August 21, 2023. The project must be completed no later than two hundred forty (240) days after notice to proceed. In the event of a delay to the project completion terms as per the Schedule for which Contractor is solely responsible, Contractor shall pay Liquidated Damages to Radnor Township at a rate of $880.00 per day of delay for every day beyond the two hundred forty (240) days allowed for project completion. The Township will not accept bids from any firm/corporation that are currently in litigation with the Township. A bid security in the amount of ten percent (10%) of the total bid is required. Bid security shall be in the form of either a Bid Bond issued by a corporate surety approved by the Secretary of Insurance to do business in the Commonwealth of Pennsylvania, or a certified check or an Irrevocable Letter of Credit issued by a bank licensed to do business in the Commonwealth of Pennsylvania. The work in connection with this project constitutes a Public Works by a Public Body under Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, must be paid to workmen employed on this project. Contractor shall comply with the terms and conditions of grant agreements awarded to the Township for this project. The Township Board of Commissioners reserves the right to add or delete portions of work based on budgetary constraints, to waive any informalities and to reject any or all proposals, or parts thereof, for any cause permitted by law, as it deems in the best interest of the Township. The standard under which bids will be evaluated are included in the bid package.

Award

Water / Sewer

$2,872,508.00

Public - City

Site Work

26

17

6

5

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
409
Active Projects
163
Bidding Soon
3,562
All Active Projects
1,626
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2023

August 14, 2023

img_map_placeholder

S Devon Ave, Wayne, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.