BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Kissimmee, Florida. Conceptual plans call for site work for a water / sewer project.

The Tohopekaliga Water Authority (Toho) invites interested engineering consulting firms with experience in water treatment plant (WTP) upgrades and expansions design, permitting and construction administration to submit Statements of Qualifications (SOQ) for design, permitting, bidding assistance, construction administration, and other related services for the St. Cloud service area WTP #4 upgrade and future plant expansion. Questions Due Date: May 30th 2023, 12:00 PM EDT

Conceptual

Water / Sewer

$700,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
198
Bidding Soon
2,707
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2024

Project location map

To Be Determined, Kissimmee, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.