BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in West Dover, Vermont. Completed plans call for site work for a bridge / tunnel.

This request for bids is for fully replacing and adding a second layer to decking on the green iron bridge section of the Valley Trail in the Town of Dover, Vermont. Send any questions on the RFB to: Eric Durocher Economic Development Director econdev@doververmont.com – 802.464.5100 x4 Goal for new decking implementation: Summer/Fall 2023 or As Soon As Possible The Town of Dover is looking to completely replace the decking on the bridge with modifications made to ensure easier maintenance and future replacement. Currently the decking is made up of 70.5 13’x12”x6” wooden beams. The beams are secured to the bridge using anywhere from 13 to 15 3/4” bolts each through the beams from the top to plates and nuts underneath securing to the metal trusses to the underside of the Bridge. There are also beams running on top of the current decking on either side of the bridge to fill the space between the decking and trusses which will need to be replaced as well. (See appendix A for photos) The desired replacement includes new base decking material (beam or otherwise) to replace the current sub decking on the bridge running across the bridge deck (horizontally). Additionally, a second thinner layer to be run with the travel direction of bridge (vertically) is desired to be easily removed and replaced as needed due to wear and tear from usage, maintenance and plowing. The final height of the decking must match the current height to ensure that it does not become a fall hazard and will not cause unneeded damage to our maintenance vehicles. If you have questions or would like to schedule a meeting on the project or a site visit, please contact Eric Durocher at econdev@doververmont.com or via phone at (802) 464-5100 x4.

Award

Bridges / Tunnels

$123,650.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
99
Bidding Soon
1,617
All Active Projects
736
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2023

July 24, 2023

img_map_placeholder

To Be Determined, West Dover, VT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.