Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 31, 2023 at 8:00 PM
Updated January 29, 2024
Site work for a laboratory facility in Big Spring, Texas. Completed plans call for site work for a laboratory facility.
The Contractor shall furnish a technical and cost proposal to provide services to install new barbed wire Fence and adding barbed wire to the existing fence at Big Springs, Texas 79720. a. The Contractor will work with Laboratory personnel to ensure project is accomplished in a timely manner. b. The Contractor's work shall adhere to the criteria stated within these project requirements and specifications. c. Davis Bacon Wage Rates apply to all construction contracts in excess of $2,000. Employee payroll logs for the project will be required to verify wage rates are being adhered to. d. Materials and Installation shall meet the applicable sections of the Uniform Federal Guide Specifications (UFGS). e. The UFGS specifications can be found on the listed on the Whole Building Design Guide Construction Criteria Base UFGS page at : https://www.wbdg.org/ccb/browse_cat.php c=3. f. The Contractor's work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal and local code requirements as well as current industry standards, (ie: UBC, IBC, ASTM, etc.) and health and safety codes, in effect at the time of contract award. g. Davis Bacon Wage Rates apply to all construction contracts in excess of $2,000. Employee payroll logs for the project will be required to verify wage rates are being adhered to. h. Payment, bid or other bonds may be required per the Contracting Officer's bid package. Obtaining and the cost of these bonds is the responsibility of the Contractor. Proof of Insurance is also required. i. Shutoff of utilities, if required, shall be scheduled no less than ten working days in advance. j. The Contractor is responsible for visiting the site prior to submitting a bid to observe existing conditions. No compensation will be provided for conditions that would be visible during an on-site visit for persons experienced performing this type of work. k. Clean up all debris from construction site once job is completed. l. Buildings will be occupied while construction is ongoing. Contractor will schedule work with location in order to allow location to meet current research needs. The magnitude of this contract is between $25,000 and $100,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Laboratories
$100,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 26, 2023
May 30, 2023
302 West, I-20, Big Spring, TX
Related To This Project
Big Spring, TX
Bid Date: Jul 12 2023
Big Spring, TX
Bid Date: Jun 06 2023
Big Spring, TX
Bid Date: Jun 09 2023
Big Spring, TX
Bid Date: Aug 03 2023
Big Spring, TX
Bid Date: Apr 12 2021
Big Spring, TX
Bid Date: May 07 2021
Big Spring, TX
--
Big Spring, TX
Bid Date: May 31 2023
Big Spring, TX
Bid Date: Aug 16 2023
Big Spring, TX
Bid Date: Jun 01 2023
Big Spring, TX
Bid Date: Jan 18 2024
Big Spring, TX
Bid Date: May 09 2023
Big Spring, TX
Bid Date: May 11 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
