BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 26, 2023 at 8:00 PM

Updated November 14, 2023

Demolition, site work, paving and new construction of a civil project in Salome, Arizona. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Tracs No: 060 LA 057 F038901C Project No : 060-A(214)T Termini: Quartzsite-wickenburg Hwy(Us 60) Location: Wash Bridges #426 & #427 Route No: US 60 Milepost: 57.58 to 58.25 District: Northwest Item No: 101676 The amount programmed for this contract is $1,400,000. The location and description of the proposed work are as follows: The proposed project is located in La Paz County on US 60 from MP 57.58 to MP 58.25, north of Salome. The work consists of scour retrofit and bridge railing replacement. The work includes replacing the existing bridge railing with a new bridge barrier, installing new guardrails, constructing concrete floors underneath the existing bridges, seeding and other related work. The time allowed for the completion of the work included in this contract will be 135 working days. The Arizona Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 9.36. This contract is subject to the provisions of Arizona Revised Statutes Section 42-5075 -- Prime contracting classification; exemptions; definitions. No award will be made to any contractor who is not a duly licensed contractor in accordance with Arizona Revised Statutes 32-1101 through 32-1170.03. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Surety (bid) bonds will be accepted only on the form provided by the Department and only from corporate sureties authorized to do business in Arizona. Questions and Comments Concerning the Bid Package for This Project Shall Be Directed to the Individuals Noted Below: Iqbal Hossain, P.e. Group Manager Contracts & Specification AZDOT - Scour Retrofit and bridge railing replacement.

Award

Roads / Highways

$1,900,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
5
Bidding Soon
199
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.