Site work for a water / sewer project in Anderson, Texas. Completed plans call for site work for a water / sewer project.

As of 9/7/2023, this project has not yet been awarded. Award details will be made available following September SAWS Board meeting. Sealed proposals are requested by the San Antonio Water System for the demolition of the existing 5-MGwelded steel ground storage tank and construction of a new 5-MG pre-stressed concrete ground storage tank, improvements to the existing triple control valve assembly, replacement of the existing electrical switchgear, painting and coating of the existing pumps, hydro- pneumatic tank, valves, and piping, replacement of the existing fencing, gate and security systems, electrical and instrumentation and controls improvements, site grading and drainage improvements, and other improvements necessary to complete the project as included in the Contract Documents for the Bitters Pump Station Upgrades and Tank Replacement Project. For questions regarding this solicitation, technical questions or additional information, please contact Stella Manzello, Contract Administrator, in writing via email at Stella.Manzello@saws.org or by fax to (210) 233-4290. until 4:00 PM (CDT) on June 21, 2023. Answers to the questions will be posted to the web site by 4:00 PM (CDT) on June 30, 2023, as a separate document or included as part of an addendum. Please be advised that firms responding to this RFCSP (Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or City of San Antonio officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents. Electronic proposals shall be accompanied by a bid bond in an amount not less than five percent of the total proposal price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total proposal price, SAWS will request this within 24 hours from the Respondent who did not submit a bid bond). Construction duration is 1,095 calendar days.

Post-Bid

Water / Sewer

$13,000,000.00

Public - City

Site Work

67

28

21

7

Subscribe For Documents

106 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
73
Bidding Soon
2,753
All Active Projects
960
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2023

September 11, 2023

img_map_placeholder

To Be Determined, Anderson, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.