Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and renovation of an educational facility in Franklin, Massachusetts. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
In accordance with MGL c 149, it is the intention of the Town of Franklin to retain the services of a firm for the purchase, demolition, and removal of an existing partition system and the installation of one 15' x 80' fold up Gym Divider curtain system, per specifications outlined in the written request for quotes, at the Horace Mann Middle School in the Town of Franklin. All inquiries regarding this Request for Written Quote shall be directed to the Town's Purchasing Officer: Pam Vickery Franklin Purchasing Department 355 East Central St., Room 206 Franklin, MA 02038 Phone- 508.553-4835 Fax- 508.541.5253 Email- pvickery@franklinma.gov The work to be done for this project will be done at the Horace Mann Middle School and is scheduled to begin after June 22, 2023. Eligible quotes must submit lead time on curtain delivery and be ready to install no later than August 10, 2023. Only quotes for curtain types listed in the written request for written quotes will be considered. Work must be completed by August 23, 2023. Work under this Contract shall be paid for at the contract unit bid prices which shall constitute full compensation for all material, labor, equipment, etc., required to satisfactorily complete the work 1. Demolish and remove existing 25' x 90' wooden folding partition system in its entirety. 2. Demolish and remove existingplywood casing surrounding structural beam and track in its entirety. 3. Furnish and install one (1) 25' x 80' fold-up Gym Divider curtain system. The following brands and models are being considered: - Draper, Inc. Fold-up Curtain - Performance Sports Systems, 4020 Fold-Up - Porter, 9067UN00 - Grandslam Safety, DC500 Vista Curtain 4. Gym Divider Height - the gym divider will be mounted on the track that the folding wall is currently on. The successful contractor is responsible for making that measurement after the job is awarded. 5. There will be a roofdrain repair project being work on concurrently in the gym. The Gym Divider contractor is to remove the folding wall in the gym. This demo work needs to be completed by Friday July 14th, 2023 making piping work for the RoofDrain project possible. It is essential for the contractors to work in harmony. 6. The contractor working on the wall divider project will provide floor protection in the gym for the scissor lift running on the floor with plywood to alleviate damage to the floor. The contractor will protect the floor during demolition to ensure that there is not damage to the wood floors. 7. Proposal includes lift rental and removal ofdemolished materials. 8. Site will be left broom clean. 9. Work will be performed during normal business hours. 10. All contractors who will be onsite must be of good moral character suitable to work in the vicinity ofschool age children. The contractor must complete a CORI application form for each employee who will work onsite.
Award
Educational
$28,500.00
Public - City
Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 14, 2023
June 22, 2023
224 Oak St, Franklin, MA
Related To This Project
Franklin, MA
Bid Date: Jul 13 2023
Franklin, MA
--
Franklin, MA
--
Franklin, MA
Bid Date: Jul 13 2023
Franklin, MA
Bid Date: Jul 13 2023
Franklin, MA
Bid Date: Sep 06 2023
Franklin, MA
Bid Date: Nov 17 2023
Franklin, MA
Bid Date: Sep 21 2023
Franklin, MA
Bid Date: Jun 08 2023
Franklin, MA
Bid Date: Jun 08 2023
Franklin, MA
Bid Date: Jun 06 2023
Franklin, MA
Bid Date: Jun 08 2023
Franklin, MA
Bid Date: Jan 30 2020
Franklin, MA
Bid Date: Feb 04 2021
Franklin, MA
Bid Date: Sep 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.