BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 13, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Murray, Utah. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.

This project consists of 2" rotomilling and placement of 3" bituminous concrete pavement on Winchester Street. The total quantities are estimated at 110,200 SF of mill and 2,040 Tons of bituminous overlay. Also included are pedestrian ramp improvements, limited curb and gutter replacement, one new waterway placement, and sidewalk/pedestrian improvements. Milling and paving includes work around UTA rail and requires the contractor to obtain all permitting required for this work. Question Submission Close Date 6/8/2023 5:00 PM MDT Travis Neely +1 801-264-2435 tneely@murray.utah.gov

Award

Roads / Highways

$438,400.00

Public - City

Paving, Site Work

8

6

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
77
Bidding Soon
1,010
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2023

July 13, 2023

Project location map

W Winchester St, Murray, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.