BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Tioga Center, New York. Completed plans call for site work for a educational facility.

2021 Capital Improvement Project Phase II District Wide A: K-12: 60-09-03-04-0-007-026 C: Bus Garage: 60-09-03-04-5-026-004 D: Sewage Bldg: 60-09-03-04-0-022-001 RFIs may be mailed to: Mr. Michael James, Project Manager King + King Architects LLP 358 W. Jefferson Street Syracuse, New York 13202 or e-mailed to Mr. James's attention at mjames@kingarch.com *Bid date for Plumbing Contract is July 10th at 2pm.* 1. General Construction Contract (GC) a. The General Trades Contractor shall furnish all material, labor, equipment, subcontractors, supervision, management, and administration required for the total performance of the work of this contract as listed in the following specification sections and as shown on the following drawings including, but not limited to: b. All work for project as shown on drawings: A/G-Series, A/X-Series (Asbestos), and A/A-Series unless specific to the roofing (RC Co-Op) scope or noted otherwise. c. Provide the complete work for all sections of Specification Divisions 00, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11 and 12 unless related to specific to the roofing (RC Co-Op) or Food-Service scope. 2. Plumbing Construction Contract (PC) a. The Plumbing Trades Contractor shall furnish all material, labor, equipment, subcontractors, supervision, management, and administration required for the total performance of the work of this contract as listed in the following specification sections and as shown on the following drawings including, but not limited to: b. All work for project as shown on drawings: A/G-Series, A/P and D/P- Series and D/W-Series (Wastewater Treatment Plant Upgrades). c. Provide the complete work for all sections of Specification Divisions 00, 02, 22, and Section 025300 Wastewater Treatment. 3. Food-Service Equipment Contract (FEC) a. The Food-Service Equipment Trades Contractor shall furnish all material, labor, equipment, subcontractors, supervision, management, and administration required for the total performance of the work of this contract as listed in the following specification sections and as shown on the following drawings including, but not limited to: b. All work for project shown on drawings: A/FS. c. Provide the complete work for all sections of Specification Divisions 00, 02, and Section 011400 Foodservice Equipment. 4. Roofing Construction Contract (RC) a. This work will be executed under an existing Cooperative Purchasing Agreement). 5. Mechanical Construction Contract (MC) a. This work will be executed under an existing Cooperative Purchasing Agreement). 6. Electrical Construction Contract (EC) a. This work will be executed under an existing Cooperative Purchasing Agreement). 7. Site Construction Contract (SC) a. This work will be executed under an existing Cooperative Purchasing Agreement) Bid Result GENERAL CONSTRUCTION WORK - F.E. Jones Construction - 1,289,000 Food Service Equipment - Main Ford General Supply - 598,000

Bid Results

Educational

$1,887,000.00

Public - City

Site Work

129

28

5

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
66
Bidding Soon
868
All Active Projects
444
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2023

July 21, 2023

img_map_placeholder

27 5th Ave, Tioga Center, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.