BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Grantsburg, Wisconsin. Completed plans call for site work for a bridge / tunnel; and bridge / tunnel.

Remove existing 24" x 40' metal culvert and soil material 10' width on both sides of culvert by length of culvert. Place new 36” x 44’ plastic culvert. The new culvert to be lowered below the current pipe elevation. Will require aprons & riprap. Reuse soil material, if possible. Apply asphalt; 2.5 inches x width and length of reconstruction site.

Post-Bid

Bridges / Tunnels

$300,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
127
Bidding Soon
1,477
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2023

July 7, 2023

Project location map

Borg Rd, Grantsburg, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.