BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2025 at 8:00 PM

Updated June 5, 2025

New construction of a fire / police facility in Grantsburg, Wisconsin. Completed plans call for the construction of a 12,609-square-foot fire / police facility.

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In General: This project work consists of replacing the existing Ranger Station at its current location. The new station will replace the existing DNR office at the property. The new fire response facility will include office space for 8 FTE employees and 4 LTE employees. In addition. 5 it will include a heated approximately 5-bay drive-thru garage for one Type 6 engine, two Type 8 engines, 6 and three Type 4 engines with attached trailer that carry 2 tractor/plow units and one low ground unit. The heated area will contain workspace for woodworking/small projects and fire cache. The fire response facility will also contain an unheated 1-bay drive-thru garage for storage of one forestry light trucks, mobile 9 fire cache trailer, and Conservation Warden light truck. Additional storage space within the unheated drive thru will be included. As of June 4, 2025, construction is anticipated to begin in June 15, 2025.

Award

Fire / Police

$3,300,000.00

Public - State/Provincial

New Construction

78

31

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
127
Bidding Soon
1,458
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

June 15, 2025

Project location map

To Be Determined, Grantsburg, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.