Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 4, 2025 at 8:00 PM
Updated June 5, 2025
New construction of a fire / police facility in Grantsburg, Wisconsin. Completed plans call for the construction of a 12,609-square-foot fire / police facility.
This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In General: This project work consists of replacing the existing Ranger Station at its current location. The new station will replace the existing DNR office at the property. The new fire response facility will include office space for 8 FTE employees and 4 LTE employees. In addition. 5 it will include a heated approximately 5-bay drive-thru garage for one Type 6 engine, two Type 8 engines, 6 and three Type 4 engines with attached trailer that carry 2 tractor/plow units and one low ground unit. The heated area will contain workspace for woodworking/small projects and fire cache. The fire response facility will also contain an unheated 1-bay drive-thru garage for storage of one forestry light trucks, mobile 9 fire cache trailer, and Conservation Warden light truck. Additional storage space within the unheated drive thru will be included. As of June 4, 2025, construction is anticipated to begin in June 15, 2025.
Award
Fire / Police
$3,300,000.00
Public - State/Provincial
New Construction
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2025
June 15, 2025
To Be Determined, Grantsburg, WI
Related To This Project
Grantsburg, WI
Bid Date: Jun 07 2023
Grantsburg, WI
Bid Date: Jul 31 2023
Grantsburg, WI
--
Grantsburg, WI
Bid Date: Sep 06 2022
Grantsburg, WI
Bid Date: Feb 01 2024
Grantsburg, WI
Bid Date: May 09 2024
Grantsburg, WI
Bid Date: May 06 2024
Grantsburg, WI
Bid Date: May 20 2024
Grantsburg, WI
Bid Date: Jan 12 2023
Grantsburg, WI
Bid Date: Jan 11 2023
Grantsburg, WI
Bid Date: Sep 09 2022
Grantsburg, WI
--
Grantsburg, WI
Bid Date: Mar 03 2021
Grantsburg, WI
Bid Date: Jun 10 2022
Grantsburg, WI
Bid Date: Jun 10 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
