BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Sacramento, California. Contact the soliciting agency for additional information.

The Consultant shall perform consultation, research, professional and technical services required for Roadway Design and related Project Development and Construction Services, including, but not limited to, field sampling, construction materials testing, analysis, reports, plant inspection and work related to testing equipment calibration, on an "as-needed" basis to support the Department of Transportation (Caltrans), Division of North Region Capital Outlay Support , Office of Middle Mile Broadband Network, District 1, 2, and 3, from PA&ED phase to PS&E phase completion of the Construction Support Phase Project, in the maintenance, development and construction of proposed Caltrans transportation facilities. The Caltrans Contract Manager shall assign specific work to the Consultant to assist the Caltrans work force through the issuance of Task Orders describing in detail the services to be performed. The Consultant shall only perform work that is assigned in an authorized Task Order. The Contract does not guarantee that a Task Order shall be issued. The Consultant may provide services to Caltrans including, but not limited to, Engineering Studies producing Project Development and Design products and deliverables to support the preparation of the Project Report (or Project Report equivalents), Project Approval report, developing Design Plans, Specifications and Estimates (PS&E); support to the Office Engineers during project Advertisement and Award; project history files; design support during the construction phase. MMBN elements include the conduit and accessories, protective encasement, when necessary, pull boxes, conductors and cables, vaults, warning tape, fiber optic cables, fiber optic splice enclosures, fiber optic distribution units, fiber optic markers, fiber optic connectors and couplers, and network hub shelters and associated features. MMBN elements are expected to be prefabricated products available specifically for MMBN projects unless field conditions require otherwise. The typical MMBN design entails continuous subsurface infrastructure of 4 - 2" conduits for fiber optic cable, with vaults located as needed (maximum spacing 2500 feet) and network hub shelters placed as determined by Caltrans. Deviations from the typical design may occur due to field conditions or other location-specific issues. The estimated contract is $5,920,000.00 - $9,620,000.00. 5% DVBE Participation Goal Required. The estimated contract term is 5 years. Questions concerning this Request for Qualifications (RFQ) must be submitted in writing to the attention of Alma Cortez at alma.cortez@dot.ca.gov. Questions must be received no later than seven (7) business days after the RFQ advertisement. Consultants contacting the District or Division directly seeking information about this RFQ will be disqualified from consideration in the selection process. The scheduled date to complete cost negotiations and submit final cost proposal is August 29, 2023. License as a Registered Professional Civil Engineer in the State of California.

Conceptual

Roads / Highways

$9,620,000.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
45
Bidding Soon
1,498
All Active Projects
653
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2023

img_map_placeholder

Multiple Locations, Sacramento, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.