BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Temecula, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the Contract Documents to construct for the above-stated project. The general items of work include roadway rehabilitation of Rainbow Canyon Road from the intersection of Pechanga Parkway to the southern City Limits. The roadway rehabilitation shall generally consist of grinding a thin layer of asphalt, placing a leveling course of asphalt, installation of asphalt rubber aggregate membrane (ARAM), and finally a wear course of asphalt rubber hot mix. The project also includes the removal and replacement of roadway striping, pedestrian ramps, and traffic signal loops. Question Deadline 05/30/2024 at 10:00 AM PT Online Q&A Yes Questions pertaining to this project shall be directed to Kellen Freeman Questions pertaining to this project shall be directed to Kellen Freeman, and only submitted through the Planet Bids website. The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the Contract Documents to construct for the above-stated project. The general items of work include roadway rehabilitation of Rainbow Canyon Road from the intersection of Pechanga Parkway to the southern City Limits. The roadway rehabilitation shall generally consist of grinding a thin layer of asphalt, placing a leveling course of asphalt, installation of asphalt rubber aggregate membrane (ARAM), and finally a wear course of asphalt rubber hot mix. The project also includes the removal and replacement of roadway striping, pedestrian ramps, and traffic signal loops. Pre-Bid Meeting No Online Q&A - Yes Q&A Deadline - 05/30/2024 10:00 AM (PDT) Questions pertaining to this project shall be directed to Kellen Freeman The classification of Contractor's license required in the performance of this Contract is a Class A. The required bidder's security shall be in an amount equal to at least 10% of the amount bid. A bid shall not be considered and will be deemed non-responsive unless one of the forms of bidder's security is enclosed with it The successful bidder shall be required to furnish a Labor and Materials Bond and a Performance Bond in the amount of 100% of the amount of the Contract. Liquidated Damages $1,000 per calendar day Project Duration 60 working days

Bid Results

Roads / Highways

$1,923,009.00

Public - City

Paving, Site Work

21

8

4

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
513
Active Projects
244
Bidding Soon
3,569
All Active Projects
1,648
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 6, 2024

July 8, 2024

October 7, 2024

img_map_placeholder

Pechanga Pkwy, Temecula, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.