Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 6, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Maple, Wisconsin. Completed plans call for site work for a bridge / tunnel.

The Town of Cloverland is requesting bids for the replacement of a culvert on Balsam Bend Road. The existing 8'X7' concrete box culvert is to be removed and properly disposed of. The replacement culvert will be a 117"X 79" poly coated arch culvert. There is a minimum of 21" of cover over the pipe, including a minimum of 6" of 3/4 'DBA gravel that will extend 50' on both road sides of the culvert. Fabric and DOT rip-rap are required. Proof of insurance is required. The Town reserves the right to reject any or all bids

Post-Bid

Bridges / Tunnels

$2,075,973.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
22
Bidding Soon
300
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2023

August 7, 2023

Project location map

Balsam Bend Rd, Maple, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed