EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 5, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work and addition to an industrial development in Salt Lake City, Utah. Conceptual plans call for the addition of a industrial development; for the demolition of a industrial development; and for site work for a industrial development.

The Utah Department of Alcoholic Beverage Services has asked for assistance with the Programming and design of the DABS Warehouse Expansion in Salt Lake City. The Programming for this Project will build on the Feasibility Study that was completed last year. Construction Budget: $72,000,000.00 The initial contract award will be for programming only. After satisfactory completion of the programming, DFCM may award design services to the programming consultant. The selection shall be under the Value Based Selection method. For questions regarding this project, please contact Craig Mackay | 385-381-5027 | cmackay@utah.gov. No others are to be contacted regarding this project. Submittal dates for the required references, management plans, statements of qualifications, and interviews will be based on the Project Schedule included in the Solicitation for A/E Services. All programming and design firms wishing to submit on this project must attend this meeting. Submittal dates for the required references, management plans, statements of qualifications, and interviews will be based on the Project Schedule included in the Solicitation for A/E Services. The Division of Facilities Construction & Management reserves the right to reject any or all submittals or to waive any formality or technicality in any submittal in the interest of the State. Question Submission Close Date 6/6/2023 3:00 PM MDT

Conceptual

Industrial

$72,000,000.00

Public - State/Provincial

Addition, Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Execution and Closeout Requirements, Examination and Preparation
Division 05 - Metals

Division 05 - Metals

Metal Joists
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Fill
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
25
Bidding Soon
641
All Active Projects
243
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2024

img_map_placeholder

1625 S 900 W, Salt Lake City, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.