BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Bowling Green, Ohio. Completed plans call for site work for a water / sewer project.

In general, the work consists of the replacement of approximately 680 feet of existing water main with new 8" along East Elm Tree Road. The work will also include the construction of a new manhole at the connection of the 8-inch sewer from the south to the 18-inch sewer running east and west near the bridge south of Elm Tree Road along Glenwood. The water main replacement work shall also include new fire hydrants, valves and water services including water meters and pits, and restoration of disturbed areas. Existing services are believed to include some lead water services.

Award

Water / Sewer

$421,863.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
0
Bidding Soon
1,072
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2023

July 17, 2023

Project location map

Multiple Locations, Bowling Green, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.