Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2024 at 7:00 PM
Updated February 7, 2024
Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a water / sewer project; road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Schedule A - construction of approximately 0.5 miles of 10- to 12 foot-wide paved trail with gravel shoulders, clearing and grubbing, curb and gutter, stormwater conveyance system, culvert, gravity block wall and structural earth wall, concrete driveway crossings, erosion control, site preparation, grading, traffic control, utility adjustments/relocation, roadway channelization striping, signal equipment relocation, and planting. Schedule B - approximately 1200 LF of 16-inch water main replacement from Driveway 13 to S Normandy Road; associated temporary erosion control, traffic control and surface restoration. Request for Information: Submit all inquiries via email to the Contract Specialist and cc the Alternate Contract Specialist. No verbal answers by any County personnel or its agents and consultants will be binding on the County. Buyer (Contract Specialist): Mark Hoge, mark.hoge@kingcounty.gov, 206-263-9325 Alternate Buyer (Alternate Contract Specialist): Melissa Jordan, mejordan@kingcounty.gov, 206-263-4005 Engineer's Estimate: $4,475,797 Work site: 8th Avenue S/Des Moines Memorial Drive Intersection to S. Normandy Road/Des Moines Memorial Drive in the City of Burien. Subcontracting Opportunities: Grading, Drainage, Storm sewer, Structure, Surfacing, Hot Mix Asphalt, Erosion control and roadside restoration, Traffic control, Utility improvements, Professional services. Apprenticeship Requirements: 15% minimum Apprentice Utilization Requirement. SCS Utilization Requirements. 15% minimum requirement for King County Certified Small Contractors and Suppliers (SCS). Bid Guaranty: Not less than five percent (5%) of the Total Bid Price.
Award
Sidewalks / Parking Lot
$3,745,589.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 13, 2023
February 12, 2024
Des Moines Memorial Dr, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Jun 21 2023
Seattle, WA
Bid Date: Jun 21 2023
Seattle, WA
Bid Date: Jul 07 2023
Seattle, WA
Bid Date: Jun 28 2023
Seattle, WA
Bid Date: Jun 14 2023
Seattle, WA
Bid Date: Jun 28 2023
Seattle, WA
Bid Date: Jun 15 2023
Seattle, WA
Bid Date: Jun 29 2023
Seattle, WA
--
Seattle, WA
Bid Date: Jul 19 2023
Seattle, WA
Bid Date: Jun 29 2023
Seattle, WA
Bid Date: Jun 15 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
