Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 29, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Ankeny, Iowa. Completed plans call civil work for a sidewalk / parking lot.

The Uptown Parking Improvements include the paving and striping of parking stalls along SW 3rd Street from approximately 220' east of SW Walnut Street to 55' west of SW Pleasant Street and along SW Cherry Street from SW 3rd Street to 125' feet south of SW 4th Street. The parking improvements include approximately 990 SY of 7" thick PCC Class C-SUD pavement, curb and gutter, Class 10 excavation, subgrade preparation, sidewalks, pavement markings, temporary traffic control, erosion control, final surface restoration, and miscellaneous associated work necessary to complete the project.

Bid Results

Sidewalks / Parking Lot

$188,968.00

Public - City

Paving, Site Work

26

6

13

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
51
Bidding Soon
760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2023

September 5, 2023

Project location map

To Be Determined, Ankeny, IA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed