BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction, renovation and addition to a mixed-use development in Fillmore, Utah. Completed plans call for the construction of a 63,000-square-foot, two-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and educational facility.

As of July 15, 2024, construction is underway and will be complete fall 2025. *The closed solicitation has been included below for reference: This courtesy posting is an advertisement of a procurement opportunity for Board of Education / Millard School District, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The Division of Purchasing does not accept responses for courtesy postings. The contract award for this solicitation will not be posted o. Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendors response will still be evaluated by Board of Education / Millard School District as described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendor's responsibility to review the entire solicitation in order to comply with any requirements. Questions may be directed to Mr. Corey Holyoak, Business Administrator, Millard School District, corey.holyoak@millardk12.org, or Mr. Philip Wentworth, Naylor Wentworth Lund Architects, philip@nwlarchitects.com. Questions cutoff: Friday, June 16, 2023 no later than 3:00 p.m. local time. If you need more information on this event, please contact: Nikki Sanchez nsanchez@utah.gov The Board of Education for the Millard County School District is proposing to partially replace Millard High School and complete an addition to Fillmore Elementary School both located in Fillmore, Utah, as well as complete a small addition to the Technology building in Delta Utah. The Millard High School project will consist of new construction of approximately 63,000 sqft on the existing campus. Schematic development proposes a two story classroom building be constructed along improvements to the existing CTE and cafeteria spaces that will remain after demolition of the existing main school building. The new building would consists of administrative offices, media center, student commons, kitchen, classrooms, and a lecture hall. The Fillmore Elementary School project is an addition to the existing Fillmore Elementary School, this will consist of 8-10 classrooms, all to be determined as budgets allow with help from the CM during design. The Delta Tech Building will consist of the expansion of shop space for the CTE programs. Millard High will include demolition of existing portions on the school campus and may require phasing of the work to allow the school campus to remain open to student use during construction activity. Fillmore Elementary School will remain operational as well with students on site during construction activity Project Schedule: 1. Programming, conceptual development and schematic design, May-June 2023 (Architect/Owner) 2. Design development, construction feasibility, preliminary costing, July August 2023 (Architect, Owner, Engineers, CM/GC) 3. Construction documents, cost modeling, phasing evaluations and agency reviews, August-December 2023 (Architect, Owner, Engineers, CM/GC) 4. Construction bidding, January 2023(Architect, Owner, Engineers, CM/GC) 5. Construction Activity Phases (Architect, Owner, Engineers, CM/GC) a. Millard High School - Spring 2024 - October 2025, portions of the projects opening for school Fall 2025, demolition and site improvements completing in Fall 2025 b. Fillmore Elementary School - Spring 2024 - June 2025, finalizing of any site work, summer of 2025. c. Delta Technology Building - Spring 2024 - June 2025 The Board of Education for the Millard School District proposes to contract with a CM/GC for the purpose of these important projects. Responsibilities of the CM/GC will include but are not limited to the following work: 1. Provide pre-construction evaluation and costing analysis. At a minimum, work will include attendance at project evaluation sessions during design, formal value engineering activity, schedule and phasing proposals and cost modeling at schematic, design development and construction document phases. 2. Oversee and be responsible for the bidding, award and contract of all necessary sub construction activity. 3. Overall Construction Management of all phasing and necessary scheduling control related to the actual construction. 4. Assistance with coordination of agency approvals, specifically the approvals related to construction phasing and construction activities on an occupied site. The Millard High School project will consist of new construction of approximately 63,000 sqft on the existing campus.

Under Construction

Educational

$40,000,000.00

Public - City

Addition, Demolition, New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
27
All Active Projects
13
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2023

May 1, 2024

img_map_placeholder

Multiple Locations, Fillmore, UT


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.