BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Napa, California. Completed plans call for site work for a transportation facility.

Airport Terminal Area Redevelopment Phase I: There are three (3) Bid Schedules included for this Project. The scope of work for each consists of the following: Bid Schedule A - Airport Electrical Improvements o Bid Schedule B - Sanitary Sewer Improvements o Bid Schedule C - Terminal Building Demolition ENGINEER'S COST ESTIMATE: The estimated cost of construction for this Project is listed below for each Bid Schedule. Bid Schedule A: $1,053,160 Bid Schedule B: $365,600 Bid Schedule C: $327,500 All questions must be mailed (certified mail) or e-mailed by September 12, 2023, to Alex Radovanovich at alex.radovanovich@meadhunt.com or Mead & Hunt, Inc, Attn: Alex Radovanovich, 1360 19 th Hole Drive, Suite 200, Windsor, CA 95492. No questions will be accepted after this date. No response will be given to questions received by phone. There are three (3) Bid Schedules included for this Project. The scope of work for each consists of the following: o Bid Schedule A - Electrical Improvements Consisting of: o Demolition of the existing electrical vault building and abandoned well, including hazardous abatement o Removal of the existing emergency back-up generator o Removal of the existing rotating beacon and tower, including hazardous abatement o Installation of airfield electrical equipment in existing room within 2000 Airport Road building, using existing PG&E service o Extension of airfield electrical systems to the proposed electrical room o Installation of lighting control equipment via radio connection between Air Traffic Control Tower (ATCT) and proposed electrical room o Connection of existing 2000 Airport Road building emergency back-up generator to proposed electrical room o Relocation of the solar connection from the existing electrical vault building to a new circuit breaker in the 2000 Airport Road building o Installation of new roof-mounted rotating beacon on the 2000 Airport Road building o Relocation of existing Airport access gate (Gate 4) to new location north of Gate 5, and extension of electrical infrastructure to the new gate location o Bid Schedule B - Sanitary Sewer Improvements Consisting of: o Abandonment of existing sewer pipelines and sewer manhole structures o Installation of 8-inch sewer main pipeline, precast sewer manhole structures, and stub outs for future laterals o Bid Schedule C - Terminal Building Demolition Consisting of: o Installation of temporary Air Operations Area (AOA) fence to replace existing Airport Terminal Building o Demolition of existing Airport Terminal Building, including hazardous abatement PW 23-29R-A, PW 23-29R-B, AND PW 23-29R-C The estimated cost of construction for this Project is listed below for each Bid Schedule. Bid Schedule A: - PW 23-29R-A: $1,053,160 Bid Schedule B: - PW 23-29R-B: $365,600 Bid Schedule C: - PW 23-29R-C: $327,500

Award

Transportation Terminals

$362,000.00

Public - County

Site Work

51

14

2

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
345
Active Projects
174
Bidding Soon
3,284
All Active Projects
1,298
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 21, 2023

November 20, 2023

February 20, 2024

img_map_placeholder

200 Airport Rd, Napa, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.