BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 14, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Lower Makefield Township, Pennsylvania. Completed plans call for site work for a bridge / tunnel.

The Township of Lower Makefield is performing stormwater infrastructure improvements on South Drive to replace an existing culvert structure. In general, the work consists of, but is not limited to: demolition of existing culvert, preparing site for culvert installation, backfill, restorations, and other associated improvements as needed. The new culvert and wing walls will be purchased and installed by others. The contractor shall excavate to depth required and install new bedding for the new culvert and wing walls. Once the new culvert and wing walls has been installed by others, the contractor shall backfill and perform restorations.

Award

Bridges / Tunnels

$176,568.00

Public - State/Provincial

Site Work

12

16

4

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
954
Active Projects
505
Bidding Soon
7,255
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

July 20, 2023

Project location map

South Dr, Lower Makefield Township, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.