BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 19, 2021 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Lower Makefield Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

Requests for clarification are due Monday, May 24, 2021 10:00:00 AM [(UTC-05:00) Eastern Time (US & Canada)]. The work includes installation of approximately 5,700 LF of trenchless cured in place pipe (CIPP) pipe liner for eight (8) inch gravity sanitary sewers, cleaning, video televising, and grouting of sanitary sewer mains. Sanitary laterals are to be televised and determined which are active and non active laterals, all active laterals are to receive installation of CIPP liner (up to two feet). Requirements for a 10% Bid Bond, 100% Performance Bond, 100% Payment Bond, 10% Maintenance Bond and Contractor's Insurance are included in the Contract Documents. Each Bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Instruction to Bidders. Lower Makefield Township reserves the right to reject any or all bids, and to make such award as appears most advantageous to the Township. The Contract duration will 120 days beginning from Notice to Proceed through Substantial Completion. Unless extended in writing and signed by both parties. Required Work for this project consists of the video inspection and installation of Cured In Place Pipe Lining for approximately 5,700 LF of existing sanitary sewer mains and laterals located in Lower Makefield Township. The specific area of work is located at the Buck Creek Interceptor within the Morrisville Municipal Authority (MMA) Service Area and composed of eight inch (8") pipe size. The work includes, but may not be limited to; repair of existing sanitary sewer main using Cured In Place Pipe Lining; cleaning, televising and grouting of sanitary sewer mains and laterals; Sanitary laterals are to be televised and determined which are active and non active laterals, all active laterals are to receive installation of CIPP liner (up to two feet); traffic control; coordination with the Owner and users of the system during the course of the work

Award

Water / Sewer

$215,425.00

Public - City

Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
17
Bidding Soon
3,931
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2021

June 25, 2021

Project location map

Multiple Locations, Lower Makefield Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.