BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2020 at 7:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Lower Makefield Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

The Lower Makefield Township is soliciting sealed bids online via the PennBid program for Contract SWR 20-4A, General Construction for the Stackhouse P.S. Upgrade; Contract SWR20-4B, Electrical Construction for the Stackhouse P.S. Upgrade; Contract SWR 20-4C, Conveyance System for the Stackhouse P.S. Upgrade; Contract SWR 20-4D Total Construction for the Stackhouse Pump Station Upgrade (single bid for all work included in Contract SWR 20-4A, Contract SWR 20-4B, and Contract SWR 20-4C). The Stackhouse Pump Station is located northeast of Stackhouse Drive. The work involves the furnishings of all labor, materials, transportation, tools, supplies, and equipment necessary for the construction of a duplex submersible pump station including precast wet well, valve vault, two submersible pumps, control building, station piping, emergency generator and associated site work. The work also includes installation of proposed work also includes the installation of approximately 500 linear feet of 8" SDR-26 PVC gravity sewer, precast manholes, and approximately 500 linear feet of 4" SDR-21 PVC force main. The work also includes the decommissioning of an existing ejector station. All work is in Lower Makefield Township, Bucks County, Pennsylvania, as provided for in the bid documents. Clarification Deadline: 10/22/2020 2:00 PM Requirements for a 10% Bid Bond, 100% Performance Bond, 100% Payment Bond, 10% Maintenance Bond and Contractor's Insurance are included in the Contract Documents. Each Bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Instruction to Bidders. Lower Makefield Township reserves the right to reject any or all bids, and to make such award as appears most advantageous to the Township. CLARIFICATION DEADLINE 10/22/2020 2:00 PM CONTRACT TIMES.- 180 days beginning from Notice to Proceed The work involves the furnishings of all labor, materials, transportation, tools, supplies, and equipment necessary for the construction of a duplex submersible pump station including precast wet well, valve vault, two submersible pumps, control building, station piping, emergency generator, gravity sewer, force main and associated site work. The work also includes the decommissioning of an existing ejector station. All work is in Lower Makefield Township, Bucks County, Pennsylvania

Award

Water / Sewer

$629,750.00

Public - City

Site Work

Subscribe For Documents

115 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
981
Active Projects
518
Bidding Soon
7,227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2020

November 26, 2020

Project location map

Stackhouse Dr, Lower Makefield Township, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.