BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 14, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a civil project in Fort Smith, Montana. Completed plans call for site work for a water / sewer project.

Schedule 1 - Base Bid - Western Municipal Construction Inc - $3,203,757 Schedule 2 - Base Bid - Prospect Construction Inc - $3,295,901 Schedule I: Includes upgrades to the collection system consisting of approximately 15,000 linear feet of 8-inch PVC sewer main, roughly 60 new 48-inch sewer manholes, and reconnection of 228 existing sewer services. A road crossing consisting of 100 feet of 18-inch steel casing, joint restraints, casing spacers, sacrificial anodes, and end seals. This schedule will also include approximately 1,350 linear feet of 4-inch PVC force main. Restoration of grass areas, gravel roads, and asphalt where it is disturbed is also included in this schedule. Traffic control and bypass pumping are also included, as necessary. The existing sludge contained in the existing septic tanks and lagoon must be disposed of properly. In addition, the existing septic tanks must be demolished, and existing lagoon site restored. Schedule 2: Includes the construction of a new lift station, force main, lagoons, land application system, and disposal of existing sludge. The lift station includes a new above-grade package lift station utilizing submersible pumps, bypass connection, various piping and fittings, level controls, and control panel. A flow meter vault, jib crane, and propane backup generator are also part of the lift station improvements. The force main consists of approximately 3,000 linear feet of 4-inch PVC piping. The force main also has a road crossing consisting of 100 feet of 12-inch steel casing, joint restraints, casing spacers, sacrificial anodes, and end seals. The lagoons include a 2.65 Mgal partial-mix aerated lagoon and a 4.42 Mgal storage lagoon. Both lagoons will have 45-mil reinforced polyethylene liner over 8-oz geotextile underlayment. The lagoons also include influent and effluent structures and control valves, PVC inter-lagoon piping, ductile iron overflow pipes, and gravel access road. The land application system includes a new floating intake screen, irrigation pump station, PVC effluent discharge piping, and a 280-foot radius irrigation pivot. The land application site will be 5.5 acres of alfalfa with a 200-foot buffer zone. Engineering Estimate: Schedule 1 - $2,500,000 Schedule 2 - $4,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$6,499,658.00

Public - City

Site Work

97

29

13

7

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
14
Bidding Soon
115
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2023

September 11, 2023

Project location map

Multiple Locations, Fort Smith, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.