Site work for a water / sewer project in Santa Cruz, California. Completed plans call for site work for a water / sewer project.

The project location in the County of Santa Cruz is as follows: Along Rodeo Gulch from Soquel Drive to Capitola Road Work includes rehabilitating sewer lines, lining existing manholes, replacing frame and lids, and inspecting and rehabilitating structural members of steel pipe bridge. Complete the work within 260 working days. The project is approximately 1.5 miles long and includes two separate sewer sections: The upper section runs parallel to Rodeo Gulch Creek from Soquel Drive to just north of Capitola Road; the lower section runs mostly along surface streets from a private road in a mobile home park (APN 028-021-07) to the Rodeo Pump Station on Richmond Drive The proposed project involves rehabilitating two deteriorated sections of an existing sewer main (Rodeo Gulch trunkline), repair and rehabilitation of a steel trestle sewer pipe bridge, and installation of an auxiliary wet well at the existing Rodeo Pump Station. The existing sewer system has structural defects in pipes, joints, manholes and other connections caused by age and deterioration that need to be repaired. The steel trestle pipe bridge has damaged frame members that require replacement and deteriorated paint that needs to be rehabilitated to prevent further damage to the structure. The work will be implemented as three separate construction projects: The Upper Rodeo Gulch Trunkline Rehabilitation will use a trenchless pipe lining method (cured-in-place pipe) to rehabilitate the existing underground pipe with minimal surface disturbance, and repair/repaint the existing pipe bridge. Some small segments of pipe will require replacement through conventional (open cut) trenching. The Lower Rodeo Gulch Trunkline Replacement will replace existing pipe using conventional trenching within paved roads and other previously disturbed areas, and the Rodeo Pump Station Capacity Upgrade will install a wet well within a paved area at the existing pump station.

Award

Water / Sewer

$5,779,510.00

Public - County

Site Work

7

60

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
58
Bidding Soon
1,280
All Active Projects
551
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2023

September 4, 2023

img_map_placeholder

Multiple Locations, Santa Cruz, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.