Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 30, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Thousand Oaks, California. Completed plans call for site work for a water / sewer project.

This project consists of installing 54 sewer lateral connection inserts at locations Citywide. The general items of work include preparing existing sewer lateral connections to receive a UV-cured, resin-impregnated felt sewer lateral connection insert (SLC) at the identified locations. Work also includes preparation of the existing liner, if applicable, cleaning the existing lateral connection, pre-and post CCTV, bypassing of the sewer main as necessary, and traffic control.

Bid Results

Water / Sewer

$119,980.00

Public - City

Site Work

6

13

4

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
542
Active Projects
249
Bidding Soon
3,360
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2023

July 28, 2023

Project location map

Multiple Locations, Thousand Oaks, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed