BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2025 at 7:00 PM

Updated February 21, 2025

Site work for a mixed-use development in Watauga, Texas. Completed plans call for site work for a water / sewer project; and playground / park / athletic field.

The purpose of the stormwater rehabilitation project is to better manage stormwater, improve the headwall at Yampa Trail, and expanding the usable park land. In addition, the plan is to improve place-making and beautification city-wide. This project will connect residents on Deer Run Drive with their neighbors on Yampa Trail and provide a connection to the Park Vista Trail system. After completion of this project, a park shall be developed on said land. As of February 20, 2025, the project is currently under construction. The completion timeline was not released.

Under Construction

Playgrounds / Parks / Athletic Fields

$517,141.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
173
Bidding Soon
3,764
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 2, 2025

Project location map

To Be Determined, Watauga, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.