BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Morenci, Michigan. Working plans call for site work for a playground / park / athletic field.

Sealed bids for Stephenson Park Reactivation (ARPA #0186-007) located at 125 Stephenson St. in the City of Morenci, Michigan will be received by the City of Morenci, Michigan at City Hall: 118 Orchard Street, Morenci Michigan 49256 until 10:00 a.m. local time - Tuesday March 19, 2024, when they will be publicly opened and read. This project involves one lump sum contract for the Stephenson Park Reactivation Project. The contractor is responsible for reviewing all the drawings and specifications to obtain a complete understanding of all work scope. The work includes all work indicated on the project documents, including but not limited to all work described in the technical specifications. An overview of this contract is provided below: The City of Morenci, Michigan is proposing improvements within the 2-acre site of Stephenson Park, located at 125 Stephenson Street in Morenci, Michigan 49256. Funding for this contract is being provided by the State of Michigan Department of Natural Resources SPARK Grant program. Relevant state or federal requirements apply. Major scope items of this contract include the following: - Access Pathway 6' wide or more. Work includes installation of new perimeter walking loop. - Athletic Field/Court: Work includes installation of new pickleball court. - Athletic Field/Court: Work includes renovation and expansion of an existing basketball court. - Gazebo/Pavilion/Shade Structure: Work includes installation of two new pavilions. - Landscaping: Work includes new tree planting. - Site Amenities: Work includes installation of new benches, picnic tables, trash bins and bicycle racks. - Utilities: Work includes installation of new pedestrian scale light fixtures to provide lighting at the walking loop, pavilions, playground and sport courts. - Parking Paved with Accessible Spaces: Work includes renovation and restriping of existing parking area to add accessible spaces. - Picnic Area: Work includes renovation of existing concrete pad into a picnic area. - Play Equipment (including safety surfacing): Work includes replacement of existing play equipment including safety surfacing. Substantial completion of construction is anticipated for May 2025, with full project closeout by Dec 1, 2025 to meet MDNR grant requirements. Beginning Tuesday February 20, 2024 the Bidding and Contract Documents may be examined free of charge and obtained in person or by mail from Ashley Ables, Deputy Clerk at Morenci City Hall, 118 Orchard Street, Morenci Michigan. A fee will be charged if mailing is required. There will be a pre-bid meeting on Thursday February 29, 2024, at 10:00 a.m., at the Project Site. All interested bidders are encouraged to attend. All RFI's are due electronically by 5:00 pm on Friday March 14, 2024 (RFI's received after this date will not be processed) to Lisa DuRussel: LISA@SITESCIENCESTUDIO.COM

Final Planning

Playgrounds / Parks / Athletic Fields

$863,500.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
335
Active Projects
193
Bidding Soon
2,693
All Active Projects
1,054
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 19, 2024

December 3, 2024

img_map_placeholder

125 W Stephenson St, Morenci, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.