BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Zion, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

City/County - Zion Roadway Resurfacing includes 4.25'of HMA Surface Removal, 2'HMA Surface Course, 2.5" HMA Binder Course, spot Sidewalk Removal & Replacement, spot Curb & Gutter Removal and Replacement, Preparation of Base, Topsoil, Seeding, and Erosion Control Blanket, at the locations listed below: 1. Eschol Avenue (21st Street to 23rd Street) (BASE BID) 2. Enoch Avenue (22nd Street to 23rd Street) (BASE BID) 3. Ezra Avenue (29th Street to 30th Street) (ALTERNATE 1) Full Depth Reclamation includes 5" of HMA Surface Removal, 2" HMA Surface Course, 2.5" HMA Binder Course, spot Sidewalk Removal & Replacement, spot Curb & Gutter Removal and Replacement, Base Stabilization (with cement), Topsoil, Seeding, and Erosion Control Blanket, at the locations listed below: 1. Shiloh Boulevard (Edina Avenue to Elim Avenue) (BASE BID) 2. 27th Street (Edina Avenue to Elim Avenue) (BASE BID) 3. 31st Street (Lewis Avenue to Lebanon Avenue) (ALTERNATE 4) Alley Reconstruction includes Pavement Removal (of variable depths), Earth Excavation, Removal and Disposal of Unsuitable Material, 1.5" HMA Surface Course, 3" HMA Binder Course, Aggregate Base Course, and Aggregate Subgrade Improvement at the locations listed below: 1. Alley West of Jethro Avenue (23rd Street to 24th Street) (BASE BID) 2. Alley East of Gilead Avenue (Dead End to 18th Street) (ALTERNATE 2) 3. Alley East of Gilead Avenue (18th Street to 19th Street) (ALTERNATE 3 Project Location : Various Streets & Alleys throughout the City of Zion, Illinois (SEE CONTRACT PROPOSAL) Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Roadway Resurfacing - 23-00095-00-PV Full-Depth Reclamation Base Stabilization 8" (w/ Cement) which consists of 5" HMA surface removal and replacement with HMA Surface Course, Mix "D", N50 - 2" and HMA Binder Course, IL 19.0, N50 - 2.5" at the locations shown on the typical section. Resurfacing which consists of 4.25" surface removal and replacement with HMA Surface Course, Mix "D", N50 - 2" and HMA Binder Course, IL 19.0, N50 - 2.5" at the locations shown on the typical section. Alley reconstruction which consists of pavement removal, HMA Surface Course, Mix "D", N50 - 1.5", HMA Binder Course, IL 19.0, N50 - 3", and Aggregate Base Course, 6" at the locations shown on the typical section All questions regarding this project should be directed to William Loftus, Christopher Burke Engineering, Ltd. at 847-823-0500 or wbloftus@cbbel.com.

Award

Roads / Highways

$813,093.00

Public - City

Paving, Site Work

25

5

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
125
Bidding Soon
1,994
All Active Projects
844
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2023

August 28, 2023

img_map_placeholder

Multiple Locations, Zion, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.