BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Sierra Vista, Arizona. Completed plans call for the renovation of a military facility.

Questions about the solicitation are to be directed through email to rhonda.k.gill.civ@army.mil before the due date of 30 June 2023 vat 09:00 Local AZ time. Scope This Statement of Work (SOW) defines the tasks to be performed by the Contractor under the terms and conditions of the Contract and/or Purchase Order. This SOW describes the requirement for DSX Access Systems compatible access control systems for three areas of support as follows: The reuse of existing equipment if applicable and/ or replace a DSX compatible access control system replacing the existing facility module and repairing to full working order one turnstile access center as applicable at Kelly Operations ("Kelly Ops"). The installation of a single DSX compatible access control system at the Directorate of Resource Management (DRM). The upgrade of a single door to the current DSX access control system at Davis Hall. The movement of existing DSX workstation within Riley Barracks. Place of performance is Kelly Operations (building 61730), DRM (building 41408), Davis Hall (building 61820), and Riley Barracks (building 51005), on Fort Huachuca, Arizona. The term "Government" as used in this Statement of Work (SOW) shall mean the U.S. Government. The term Contracting Officer (KO) shall herein be referred to as KO. Background Kelly Ops, bldg 61730: The entire facility is certified as an open storage area (OSA). In this effort there is a need to repair both turnstile access control modules, replace the access control software, provide 1 computer tower, and add 23 Level 1 Proxy/CAC readers to interior doors and 6 Level 2 Proxy/CAC plus Pin readers. This would need to be tied into the existing access control system which would require DSX compatibility. The existing system can no longer be updated or repaired. DRM, bldg 41408: This facility is progressing through certification as an open storage area (OSA). This facility requires the installation of a new access control software, enrollment station, provision of 1 computer tower, and 1 Level 2 Proxy/CAC plus Pin reader to the single exterior door entrance. Davis Hall: This facility requires the upgrade of a door for the existing access control system, which requires one Level 2 Proxy/CAC plus Pin reader to the single exterior door entrance. Riley Barracks: This facility requires the movement of an existing and fully functional DSX workstation into room #1117. 1.1 General Requirements 1. Contractor will install and test a new DSX compatible access control system software and equipment ensuring 39 doors are controlled and operated by the DSX software for Kelly Ops (bldg 61730), one door for DRM (bldg 41408), on door for Davis Hall (bldg 61820), and the movement of a DSX workstation from one room into a new room in Riley Barracks. 2. Contractor will provide DSX software training to authorized personnel 3. Contractor shall provide a proposal for all material, labor, and equipment necessary to perform all tasks required and shall complete all tasks during the Period of Performance. 4. Contractor proposal shall include equipment, shipping, delivery, assembly, installation and testing of the solution(s) installed. 5. Where available, onsite utilities will be provided at no cost to the Contractor. These utilities will be used only in the performance and support of the project. 1.2. Additional Requirements A. Bldg 61730 (Kelly Operations) (Enclosure 1) 1. Turnstile Access North/South side of Kelly Ops a) Contractor shall purchase and install new Level 2 compliant CAC/proxy plus pin readers with keypad privacy shield for the turnstiles and ADA gates. Contractor will remove the current keypad located at the double doors. b) Install new spring and read switches in turnstiles. 2. Room 102 Conference Room a) Contractor will provide and install 1 computer (Tower) with new DSX software with enrollment capability. b) Install one Level 1 CAC/Proxy card reader. 3. Remove old card readers and install new Level 1 Proxy/CAC card readers for access control for the following areas: Rooms 105, 134, and 226 (2 Doors) 4. Install new Level 1 Proxy/CAC card reader for access control for the following areas: Rooms 111 (2 Doors), 114 (2 Doors), 124/125 (2 Doors), 168/171/177 (3 Doors), 183 (2 Doors), 184, 190, 190A, 153, 150, 148, 145, 129A, 233, 234, 208 (2 Doors), 214, and 217 5. Demo a) Contractor required to move wall mounted items such as existing keypad(s) to install new items. b) Contractor required to removed old enrollment station equipment (Government will dispose of computer system) from room 190A c) The contractor shall patch and paint areas affected by the removing or installing of equipment and return the affected area to its original appearance. 6. Computer and Software a) The Contractor shall provide a new computer system in room 102 b) The Contractor shall provide all software needed to run the DSX program. c) Contractor will provide training on the usage of DSX software to Bldg Security Managers. B. Bldg 41408 (Leonard Wood Hall) (Enclosure 2) 1. Contractor shall purchase and install new Level 2 compliant CAC/proxy plus pin readers with keypad privacy shield for the access door to the Bldg. 2. Contractor will prove and install 1 computer (Tower) with new DSX software with enrollment capability. 3. Contractor will provide training on the usage of DSX software to Bldg Security. C. Bldg 51005 (Riley Barracks) (Enclosure 3) 1. Contractor will move computer and enrollment station from room 1082 to room 1117. 2. The contractor shall patch and paint areas affected by the removing or installing of equipment and return the affected area to its original appearance. 3. Contractor will add a keypad privacy shield to room 1117 keypad. D. Bldg 61820 (Davis Hall) (Enclosure 4). 1. Contractor shall purchase and install new Level 2 compliant CAC/proxy plus pin readers with keypad privacy shield for the east side access door to the Bldg. 2. Contractor will add a keypad privacy shield to the west side keypad. Contractor shall maintain security integrity of the area at all times. When not working the turnstile walk-thru must be able to secure and function as normal.

Post-Bid

Military

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
10
Bidding Soon
122
All Active Projects
48
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2023

July 17, 2023

img_map_placeholder

To Be Determined, Sierra Vista, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.