BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Abbotsford, British Columbia. Contact the soliciting agency for additional information.

Matsqui FN is requesting expression of interest submittals from Proponents experienced in the sourcing, supply and placement of fill material to supply the following scope of work: Source import fill and submit the required environmental and geotechnical documentation showing satisfactory quality control test results. Meet the Soil Acceptance Criteria in Section 6.3 of Thurbers document, Appendix A, including, but not limited to: assurance the fill meets residential quality requirements of the BC Environmental Management Act and all associated regulations. assurance the fill meets the residential / parkland Canadian Soil Quality Guidelines for the Protection of Environmental and Human Health (federal lands fall under the jurisdiction of the Canadian Council of Ministers of the Environment) compliance with the soil relocation process detailed in the Stage 14 amendments of the British Columbia Contaminated Sites Regulation and follow the procedures described in the soil investigation for characterization protocol. Per Matsqui FNs Soil Deposit, Removal, and Land Contamination Law, all material deposited on reserve must have paperwork signed by a Qualified Professional that certifies the material meets all regulations. Remediated soil, which includes soil that has been remediated or treated in any way, regardless of post-treatment test results, will not be accepted as fill. Provide, manage, and adhere to a project schedule. Provide, maintain, and adhere to a quality management plan including placement order and staging. Provide, keep updated, and adhere to site health and safety plans that would meet or exceed BC Workers Compensation Board requirements. Provide, keep updated, and adhere to Construction Environmental Management Plans. Consider and respond to fill material opportunities presented by Matsqui FN or other 3rd party prospects. Construction layout survey for fill site boundaries, fill lift depths, and any other survey requirements to place and compact fill material to specification. Excavate, haul, place, spread, and compact fill material previously stockpiled on site, approximately 9,000 m3, per instruction from Thurber and following the requirements in Appendix A Material on site to be used, as much as possible, in this Phase 1 fill project. Per 6.2.1 of the Thurber document (Appendix A) the material stockpiled on site needs to be sorted, and undesirable fill removed from site (concrete debris, rebar, fill with maximum dimensions greater than 500mm). Place and install, protect, survey, and maintain settlement gauges throughout the site to the satisfaction of Matsqui FN and Thurber. Adhere to the Settlement Monitoring section 6.4.2 of the Thurber requirements, Appendix A. Provide monthly reporting to the satisfaction of Matsqui FN for each of the submitted plans. The method of Contractor Selection has not been Determined at this time.

Conceptual

Fire / Police

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
42
Bidding Soon
1,442
All Active Projects
577
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

img_map_placeholder

5720 Julian Dr, Abbotsford, BC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.