BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 17, 2023 at 8:00 PM

Updated March 22, 2024

Site work, paving and new construction of a mixed-use development in Quincy, Massachusetts. Completed plans call for the construction of a 300,000-square-foot, two-story above grade transportation facility; for site work for a transportation facility; water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

MBTA Quincy Bus Maintenance Facility, Quincy, MA (QBMF). QBMF includes but is not limited to the construction of a new, 300,000 square foot, 2-story, LEED Certified bus facility with BEB charging equipment (including but not limited to pantographs, chargers, and plug-in dispensers), charge management software (CMS), approximately 240 parking spaces, a new sidewalk along Burgin Parkway, an extension of Columbia Street to Burgin Parkway, a new signalized intersection, utility connection across Burgin Parkway to MBTA Quincy Adams Station communication room, a proposed electrical switching station, and two substations. The RFQ for Trade Contractors will be available online on starting June 9, 2023 at 9:00 AM EDT at www.Projectdog.com. Enter the Project Code 856349 in the project locator box and select Acquire Documents to download documents. Respondents must have an active online account on www.Projectdog.com to acquire documents, receive project notifications, and to submit SOQs electronically. All Trade Contractors interested in responding to this RFQ must complete the RFQ Interest Survey online at www.Projectdog.com prior to the submission deadline. Trade Contractor Statement of Qualifications Forms from interested trade subcontractors are sought for the following categories of work. Masonry Work: $6,915,108 Miscellaneous and Ornamental Iron: $2,457,043 Waterproofing, Damp-proofing and Caulking: $911,894 Roofing and Flashing: $8,866,151 Glass and Glazing: $116,017 Tile: $369,440 Acoustical Tile: $218,573 Resilient Floors: $254,326 Painting: $2,164,276 Elevators: $3,255,000 Fire Protection Sprinkler System: $4,957,852 Heating, Ventilating & Air-Conditioning (HVAC): $20,602,556 Plumbing: $8,424,354 Electrical Work: $89,596,331 Anticipated substantial completion is fall 2026.

Bid Results

Transportation Terminals

$77,653.00

Public - State/Provincial

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
5
Bidding Soon
2,158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2023

September 4, 2023

Project location map

599 Thomas E. Burgin Pkwy, Quincy, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.