Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Oakland, California. Contact the soliciting agency for additional information.
The Roosevelt Middle School Modernization Project is comprised of several work scopes and phases. 1. Increment #1 includes Site Preparation for Interim Housing and Modular Science Building (not in Commissioning Scope of Work). 2. Increment #2 (Interim Housing) includes but not limited to the delivery and placement of Interim Housing consisting of 13 (24'x40') classroom portables, one (40'x48') administration office portable, and one (12'x40') restroom portable (not in Commissioning Scope of Work). Construction Schedule: start 12/2023 and finish 7/31/2024 3. Increment #2 (Modular Science Building) includes but not limited to the delivery and placement of a (40'x96') Modular Science Building and one (12'x40') restroom portable. Construction Schedule: start 12/2023 and finish 7/31/2024 4. Building "A" alterations shall include but not limited to voluntary seismic upgrades, re-roofing, new heating and ventilation system, modifications of existing fire sprinkler system, fire alarm, intrusion alarm, clock/bell/PA and data/network systems. Building "A" was built in 1922 and it was reconstructed in 1935 to comply with the Field Act. The two-story structure includes administration office spaces, classrooms, 1012-seat auditorium with stage and balcony, and La Clinica health clinic. The Lower Level is 32,971 s.f., the First Floor is 45,365 s.f. and the Mezzanine is 7,000 s.f. Total building area is 78,336 SF Alterations to Building "A" shall include, but not limited to, voluntary seismic upgrades, re-roofing, enlarging existing classrooms, new heating and ventilation system, main office renovation, new entry ramp, ADA parking stalls, modifications of existing fire sprinkler system, fire alarm, intrusion alarm, clock/bell/PA and data/network systems. Scope includes new 3000Amp switchgear equipment to replace existing switchgear and new PG&E transformer pad. Renovation of the Main Building (Building "A") will be completed in two phases by splitting Building "A" in two halves: Half of the students and teachers plus administrative staff will be relocated from the Main Building (in phase 1) to portable interim housing while the other half remains in Building "A". When construction in phase 1 is completed, the second half of the students and teachers will be relocated (phase 2) to portable interim housing while those in phase 1 re-occupies Building "A". The health clinic will remain occupied during both phases. Construction Schedule: start 9/2024 and finish 7/31/2027 (approx. 3 years) The Oakland Unified School District ("District") is requesting proposals from experienced firms, partnerships, corporations, associations, persons or professional organizations ("Consultants") to provide Building Commissioning (Cx) services associated with the modernization of Roosevelt Middle School ("Project"). Question Deadline 06/28/2023 at 4:00 PM If you have any questions regarding this RFQ/P and/or submitting proposal electronically, please email Kenya Chatman at kenya.chatman@ousd.org and cc: to Colland Jang at colland.jang@ousd.org July 6, 2023 District will provide written responses to requests for clarification The District reserves the right to waive any informalities or irregularities in the RFQ/P Packets. The District also reserves the right to reject any and all RFQ/P Packets and to negotiate contract terms with one or more Respondents. The District hereby affirmatively ensures that Disadvantaged Business Enterprises ("DBE"), Small Local Business Enterprise ("SLBE"), Small Emerging Local Business Enterprise ("SELBE") and Disabled Veterans Business Enterprise ("DVBE") firms shall be afforded full opportunity to submit qualifications in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, disability, gender, transgender status, political affiliation, or religion in any consideration leading to the award of contract. No qualified disabled person shall, on the basis of disability, be excluded from participating in, be denied the benefits of, or otherwise by subjected to discrimination in any consideration leading to the award.
Conceptual
Educational
$49,000,000.00
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2023
1926 E 19th St, Oakland, CA
Related To This Project
Oakland, CA
--
Oakland, CA
--
Oakland, CA
--
Oakland, CA
--
Oakland, CA
--
Oakland, CA
Bid Date: Dec 17 2020
Oakland, CA
Bid Date: Sep 30 2022
Oakland, CA
Bid Date: Sep 30 2022
Oakland, CA
--
Oakland, CA
Bid Date: Sep 01 2022
Oakland, CA
Bid Date: Feb 23 2022
Oakland, CA
Bid Date: Jul 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.